Bergé TPN Terminal relocation at the Port of Barcelona

Relocation of Bergé TPN Terminal to the Prince of Spain quay, south end, in the Port of Barcelona.

  • Terminal surface: 72.120 m2
  • 2 operational areas with a total surface area of 46.447 m2
  • The terminal has a service area that includes the administration building, maintenance workshop and spare parts store, fuel depot, equipment washing area and transformer station.

SPAIN

Hired services:

  • Executive project
  • Works Management and Project Management
  • Health and Safety Coordination
  • Processing of the necessary connections and connections needed
  • Processing of licences and legalisations

SIMILAR ACtIONS