BIM2TWIN Project


The BIM2TWIN Project, “BIM2TWIN: Optimal Construction Management & Production Control”, funded by the EU and framed in the call “Industrial Sustainability H2020-NMBP-ST-IND-2018-2020” of the H2020 programme.
Budget: 6 million euros
Duaration: 41 months
www.bim2twin.eu
Bim2Twin aims to build a Digital Building Twin (DBT) platform for construction management that implements LEAN principles to optimise the process, shortening lead times, reducing costs, improving quality and safety, and reducing the carbon footprint. BIM2TWIN proposes a comprehensive and holistic approach consisting of a platform (DBT) that provides complete situational awareness and an extensible set of construction management applications, supporting a closed-loop Plan-Do-Check-Act construction.
IDP will participate in the development of the conceptualisation of the construction process for the development of the Digital Building Twin platform.
Consortium:
- Centre Scientifique et Technique du Batiment, Institut National de Recherche en Informatique et Automatique, Orange y Spada Construction (France)
- Technision – Israetl Institute of Technology y Intsite Ltd (Israel)
- The Chancellot Masters and Scholars of the University of Cambridge (United Kingdom)
- Siemens, Technische Universitaet Muenchen, Ruhr-Universitaet Bochum y Aarhus Universitaet (Germany)
- Universita Politecnica delle Marche y Unismart Padova Enterprise SRL (Italy)
Fira Group Oy (Finland) - Tecnalia, Acciona Construcción e IDP Ingenieria y Arquitectura Iberia, S.L.U. (Spain)