Construction of vessel B of the class II controlled waste deposit at Orís (Barcelona)

Third phase of expansion of the controlled deposit of class II (non-special) waste in Orís (Barcelona)

  • Floor area extension: 55,059 m2
  • Capacity expansion: 981,597 m3
  • Storm drainage of surface and subsoil water
  • Drainage of leachate to the treatment plant.
  • Biogas extraction chimneys: 15 pcs.
  • Control piezometers: 4 pcs

SPAIN

Hired services:

  • Construction project in BIM
  • Construction management in BIM

SIMILAR ACtIONS