Design engineering of a 90 MVA 30/220 kV Los Galeazos substation in Sevilla

Preparation of technical administrative documentation for the construction of a 90 MVA 30/220 kV Los Galeazos substation. The project included:

  • Environmental impact study
  • Engineering of protection, control, communications, civil, structural, hydrology, drainage, topography and geotechnical engineering
  • Burying of 220 kV line to REE substation

SPAIN

Hired services:

  • Administrative projects for AAC processing
  • Study of alternatives for evacuation of photovoltaic plant
  • Environmental impact study for substation, photovoltaic plant and underground high voltage line.