DTwin of the Los Guillermos Potable Water Treatment Station in Alcantarilla (Murcia)

Digital Twin of the Los Guillermos drinking water treatment station in Alcantarilla (Murcia) to digitize operation, maintenance and safety tasks

  • Annual volume 2,3 hm3
  • Capacity 400 m3/h
  • Granulated active carbon filtration, pre-oxidation and disinfection by ozone application

SPAIN

Hired services:

  • 3D BIM “as built” model of the plant
  • Digitalization of O&M databases
  • Integration of the 3D BIM model with the O&M databases
  • Implementation of the DI Twin application for the digital operation of the plant

SIMILAR ACtIONS