Holcim cement factory in Abidjan (Ivory Coast)

New cement grinding line for the Holcim factory in the port of Abidjan (Ivory Coast)

  • Cement grinding building: 15 m x 30 m (floor plan) and 42 m (height)
  • mill massif Raw
  • material hoppers between 70 and 120 tons (cement, slag, calcareous and plaster)
  • Hovercraft 2.8 m x 1.7 m (tower floor), 9.6 m (tower height), 18.2 m (length)
  • 5 pipelines
  • Electrical building: 17 m x 3.2 m (floor plan)

IVORY COAST

Hired services:

  • Basic project in BIM
  • Detailed engineering project in BIM

SIMILAR ACtIONS