Mercadona bread manufacturing plant in Abrera (Barcelona)

Bread manufacturing plant with the capacity to produce 26.000 frozen bread loaves per hour, with five kneading and baking lines, various freezing tunnels and shipping and packaging areas

  • Builded surface 16,600 m2

SPAIN

Hired services:

  • Basic project in BIM
  • Executive project in BIM
  • Management of the works tender
  • Contruction management/execution in BIM
  • Start-up

SIMILAR ACtIONS