Bromide removal plant at Iberpotash (ICL) chemical plant in Súria (Barcelona)
Industrial mechanical installations for the elimination of bromides as a complementary process to the vacumm salt crystallization plant of maximum purity (99.97% sodium chloride), in the chemical plant of Iberpotash (Israel Chemical Limited) in Mina Cabanasses in Súria ( Barcelona)
The plant is made up of a series of chemical reactors (sodium sulphite, magnesium chloride, etc.), storage silos, pipes and hydraulic pumps.
SPAIN
Hired services:
- Basic project in BIM
- Detailed engineering project in BIM