Suez Wastewater Treatment Plant in Cambrils (Tarragona)
Digital Twin of the urban wastewater treatment plant in the municipality of Cambrils (Tarragona) to digitize operation, maintenance and safety tasks
- Design flow 25,000 m3/day
- Equivalent population 125,000 inhabitants
SPAIN
Hired services:
- Digitalization of the plant (laser scanner + parametric 3D BIM model)
- Digitalization of O&M databases
- Integration of the 3D BIM model with the O&M databases
- Implementation of the DI Twin application for the digital operation of the plant