Ibiza and Formentera Ecopark Biomethanisation Plant for Giref in Ibiza (Balearic Islands)

Biomethanisation plant of the Ibiza and Formentera Ecopark, consisting of a biomethanisation line by anaerobic digestion of sewage treatment plant sludge and organic fraction of MSW. The facility has 13 composting tunnels for MOR, structured WWTP sludge digestate with vegetable fraction and structured FORM digestate with vegetable fraction.

  • Capacity treatment for organic fraction from selective collection (FORM): 20.000 t/año
  • Capacity sludge treatment of municipal sewage treatment plants (WWTP): 20.000 t/año
  • Gasometer of 1,000 m3 for accumulation of biogas from sludge and FORM methanisation
  • Quantity of biogas generated 900Nm3

SPAIN

Hired services:

  • Basic project in BIM

SIMILAR ACtIONS