Ibiza Ecopark Biomethanization Plant








Previous
Next
Basic project of the Biomethanization Plant of the Ibiza Ecopark, made up of a biomethanization line through anaerobic digestion of sewage sludge and organic fraction of MSW
- Selective collection organic fraction treatment capacity (FORM): 20,000 t/year
- Urban sewage treatment plant sludge treatment capacity (WWTP): 20,000 t/year
- Gasometer of 1000 m3, to accumulate the biogas from the methanization of sludge and FORM
SPAIN
Hired services:
- Basic project in BIM

