Ibiza Ecopark Biomethanization Plant

Basic project of the Biomethanization Plant of the Ibiza Ecopark, made up of a biomethanization line through anaerobic digestion of sewage sludge and organic fraction of MSW

  • Selective collection organic fraction treatment capacity (FORM): 20,000 t/year
  • Urban sewage treatment plant sludge treatment capacity (WWTP): 20,000 t/year
  • Gasometer of 1000 m3, to accumulate the biogas from the methanization of sludge and FORM

SPAIN

Hired services:

  • Basic project in BIM

SIMILAR ACtIONS