Biogas production plant of Grupo Aira Waste Recovery Center in Taboada (Lugo)

Development and study of waste recovery plants, with different process lines to obtain biogas with/without upgrading.

  • Capacity waste treatment (cattle slurry, sludge and slaughterhouse by-products) 70.000 t/year
  • Quantity of biogas produced 30.000 MWh/year

SPAIN

Hired services:

  • Technical-economic feasibility study
  • Project

SIMILAR ACtIONS