Biogas production plant of Grupo Aira Waste Recovery Center in Taboada (Lugo)
Development and study of waste recovery plants, with different process lines to obtain biogas with/without upgrading.
- Capacity waste treatment (cattle slurry, sludge and slaughterhouse by-products) 70.000 t/year
- Quantity of biogas produced 30.000 MWh/year
SPAIN
Hired services:
- Technical-economic feasibility study
- Project