Data Center for Atlas Edge in Sant Joan Despí (Barcelona)
SPAIN
Technical due diligence and processing to obtain an energy supply for a facility located in Sant Joan Despí, for a total power of 20,000 kW as the main supply and 20,000 kW as a supplementary supply, without these two supplies being able to be connected simultaneously.
- Built area: 35,792 m2
- Power: 20 MW
Hired services:
- Technical Due Diligence: Energy availability assessment report, Fibre availability/connectivity assessment report, Environmental and permitting assessment report
- Electricity power application
- Preliminary studies on traffic impact, construction logistics, permit processing, etc.