Data Center for Atlas Edge in Sant Joan Despí (Barcelona)

SPAIN

Technical due diligence and processing to obtain an energy supply for a facility located in Sant Joan Despí, for a total power of 20,000 kW as the main supply and 20,000 kW as a supplementary supply, without these two supplies being able to be connected simultaneously.

  • Built area: 35,792 m2
  • Power: 20 MW

Hired services:

  • Technical Due Diligence: Energy availability assessment report, Fibre availability/connectivity assessment report, Environmental and permitting assessment report
  • Electricity power application
  • Preliminary studies on traffic impact, construction logistics, permit processing, etc.