Data Center for Substrate in Talavera de la Reina (Toledo)



5MW power Data Center, expandable to 10 MW, for SUBSTRATE located in Talavera de la Reina (Toledo)
- Built area: 5,337 m2
- Power: 10 MW
SPAIN
Hired services:
- Technical Due Diligence
- Feasibility studies
- Test fit and technical report








