Data Center for TSL in San Fernando de Henares (Madrid)

20 MW Data Center in San Fernando de Henares (Madrid).

  • Built area: 22,150 m2
  • Power: 20 MW

SPAIN

Hired services:

  • Peer review + Value Engineering Services + Coordinated BIM Model
  • Project development from RIBA4 to RIBA5 and RIBA 6
  • Updating and coordination of the BIM model during construction
  • Technical assistance during the development of the work at CSA

SIMILAR ACtIONS