Data Center for Bleeding Edge in Spain

6 prototypes of modular installations with a prefabricated construction system, to be implemented in an industrialized way in different shopping centers spread throughout the country, with a potential installation of 50 installations.
3 models are presented for a power of 150, 250 and 350 KWh of total capacity.

  • Built area 6,000 m2

SPAIN

Hired services:

  • Conceptual design

SIMILAR ACtIONS