District Heating&Cooling for Mutua Terrassa of the Terrassa Campus (Barcelona)




Study for the centralised production and distribution of energy (District Heating & Cooling), for the Terrassa Campus made up of 11 buildings (general services, teaching building, accounting, drug dependency, HR and Research Foundation).
- Builded area 9,412 m2
- Energy demand for heat 1 MW.
- Cold energy demand 1.4 MW
- Investment Range 3 M€
SPAIN
Hired services:
- Technical and economic study
