District Heating&Cooling for Mutua Terrassa of the Terrassa Campus (Barcelona)

Study for the centralised production and distribution of energy (District Heating & Cooling), for the Terrassa Campus made up of 11 buildings (general services, teaching building, accounting, drug dependency, HR and Research Foundation).

  • Builded area 9,412 m2
  • Energy demand for heat 1 MW.
  • Cold energy demand 1.4 MW
  • Investment Range 3 M€

SPAIN

Hired services:

  • Technical and economic study

SIMILAR ACtIONS