Riera Gavarra channeling in the municipality of Canet de Mar (Barcelona)

Canalization of the Gavarra stream in the municipality of Canet de Mar (Barcelona)

  • Design flow section 1: 34,56 m3/s
  • Design flow section 2: 45,36 m3/s
  • Return period 500 years
  • Material:
    • Prefabricated walls and breakwater (channel)
    • Prefabricated box (ducting) (Height 2,0 m, width 5,0 m and length 790 m)

SPAIN

Hired services:

  • Basic project in BIM
  • Executive project in BIM
  • Construction management in BIM

SIMILAR ACtIONS