20kV medium voltage line for Endesa in Teruel

Reform and modification of a 20 kV medium voltage line for Endesa in the province of Teruel.

  • Removal of 30 pylons (5 metal towers and 25 HAV) and 3148.68 metres of medium voltage overhead line.
  • New installation of 28 new lattice supports and 3137.36 metres of medium-voltage overhead line

SPAIN

Hired services:

  • Layout design and conditions
  • Executive project
  • Affected assets and rights
  • Administrative support

SIMILAR ACtIONS