20kV medium voltage line for Endesa in Teruel




Reform and modification of a 20 kV medium voltage line for Endesa in the province of Teruel.
- Removal of 30 pylons (5 metal towers and 25 HAV) and 3148.68 metres of medium voltage overhead line.
- New installation of 28 new lattice supports and 3137.36 metres of medium-voltage overhead line
SPAIN
Hired services:
- Layout design and conditions
- Executive project
- Affected assets and rights
- Administrative support
