Channeling Riera de Castellolí in the municipality of Castellolí (Barcelona)




Canalization of the Castellolí stream in the municipality of Castellolí (Barcelona)
- Basin area 1,500 Ha
- Return period 500 years
- Design flow 150 m3/s
- Material curved corrugated steel plates 6,5 m in diameter along 100 m length. High strength metal bolt joints
SPAIN
Hired services:
- Basic project in BIM
- Executive project in BIM
- Construction management in BIM
