Project for the reconstruction of the Medium Voltage ring closure infrastructure between the South and North lines of the island of La Palma, as well as the Medium Voltage network for the evacuation of the new thermal power plant located in the Hermosillas area and the mobile power plant in Las Manchas; both affected by the eruption of the volcano in 2021.
- 130 kilometres of power lines
- 85 medium-voltage pylons
- 1,500 low-voltage pylons
- 19 distribution centres
SPAIN
Hired services:
- Preliminary technical study
- Executive project
- Processing of authorizations
- Construction Management