Road tunnels in the Plaza de las Glorias (Barcelona)




BIM audit of urban tunnels with two independent one-way carriageways that will collect traffic from Barcelona’s Gran Vía, with an average ADT of 90,000 cars/day.
- Length: 957m
- Lanes: 3 in each direction
- Maximum depth: 25 m below ground
SPAIN
Hired services:
- BIM audit of the construction project
- BIM technical assistance on site
