Connection UIC in COR with the FGC line Papiol/Mollet

Connection UIC in COR with the FGC line Papiol/Mollet

IDP has been assigned the contract to conduct the informative study and the study on environmental of the UIC 1435 standard broad connection of the Rubí Operations Center (COR) of the Ferrocarrils de la Generalitat de Catalunya (FGC) with the general interest rail network of ADIF’s Papiol – Mollet line.

The informative study will analyze all link alternatives proposed for the infrastructure work solutions, rail and railroad installations, including the affected service and installations replacement; surface urbanization, provisional transit detours, the possible fussiness of the railroad exploitation of the FGC and/or ADIF lines during the work execution as well as the environmental effects fixing the correction measures for each of the proposed correction alternatives.