Channeling Riera de Castellolí in the municipality of Castellolí (Barcelona)

Canalization of the Castellolí stream in the municipality of Castellolí (Barcelona)

  • Basin area 1,500 Ha
  • Return period 500 years
  • Design flow 150 m3/s
  • Material curved corrugated steel plates 6,5 m in diameter along 100 m length. High strength metal bolt joints

SPAIN

Hired services:

  • Basic project in BIM
  • Executive project in BIM
  • Construction management in BIM

SIMILAR ACtIONS