15 kV MV network and switching centre for the Jerezol photovoltaic plant in Jerez de la Frontera (Cádiz)

Redesign of existing 15 kV line by changing the conductor and junction, together with the installation of switching centers, for the evacuation of a 900 kWn photovoltaic plant, including:

  • Change of overhead line conductor
  • Replacement of existing supports
  • Modification and installation of new 15 kV switching centers

SPAIN

Hired services:

  • Administrative projects for AAC processing
  • Study of alternatives for evacuation of photovoltaic plant