Construction of vessel B of the class II controlled waste deposit at Orís (Barcelona)




Third phase of expansion of the controlled deposit of class II (non-special) waste in Orís (Barcelona)
- Floor area extension: 55,059 m2
- Capacity expansion: 981,597 m3
- Storm drainage of surface and subsoil water
- Drainage of leachate to the treatment plant.
- Biogas extraction chimneys: 15 pcs.
- Control piezometers: 4 pcs
SPAIN
Hired services:
- Construction project in BIM
- Construction management in BIM
