Proyectos

50A01_1

Gran Jonquera Shopping Center in La Jonquera (Girona)

Previous Next Extension of the Gran Jonquera shopping center in La Jonquera. It has a commercial area of ​​25,297 m2 and restaurant, leisure and office areas Builded surface 130,023 m2 1,569 parking spaces SPAIN Hired services: Executive project in BIM Management of the works tender

61A51_1

Biowaste treatment plant for UTE MAREA – HELIOPOL in Ulea (Murcia)

Treatment plant for the organic fraction of selective collection (FORS) at the Urban Solid Waste Treatment Centre in Ulea (Murcia), managed by the Consortium for Waste Management in the Region of Murcia (COREM). The project includes the construction of a new FORS pre-treatment facility (dry and wet) for subsequent anaerobic digestion, using the biogas generated […]

63B42_1

Ecofactory in the Ametller Origen Agropark in Gelida (Barcelona)

Ecofactory in the Ametller Origen Agropark in Gelida (Barcelona), which includes the development of a WWTP with water regeneration, a biomethanisation plant (1,590,000 Nm3/year) and composting (3,600 Tn/year), a photovoltaic solar plant (7MW) and a biomass plant (2MW) for heat production to be used in the food manufacturing plant. Thermal power 2 MW SPAIN Hired […]

63B41_1

Satellite LNG plant for Daveiga in Chantada (Lugo)

Installation of an LNG satellite plant for Daveiga in the Os Acivros industrial estate in Chantada (Lugo). SPAIN Hired services: Urban planning regulation justification project Application for licenses at the town hall Final certification of work

63B40_1

LNG satellite plant for Oviganic in Montforte de Lemos (Lugo)

Oviganic LNG satellite plant in Montforte de Lemos (Lugo). The floor plan is completed with the containment basin and other auxiliary elements and services. LNG tank capacity: 106 m3 Tank design pressure: 5 bar SPAIN Hired services: Detailed engineering Construction supervisión Review of engineering specifications

63B39_1

Biowaste treatment recovery center for Prezero in Colmenar Viejo (Madrid)

Separately collected Biowaste Treatment Recovery Center (Smart Farm Biogas) for Prezero located in Colmenar Viejo (Madrid). The plant will generate renewable energy by obtaining biogas from biowaste collected separately at source, and from a small part from organic co-substrates. Capac. Bio-waste 75,000 t/year Biogas capacity produced 8,961,480 Nm3/year Biomethane capacity produced 4,369,468 Nm3/year through an […]

70E8_1

Elimination of architectural barriers on public roads in Sabadell (Barcelona)

SPAIN Elimination of architectural barriers in districts 1, 2, 3 and 4 of the municipality of Sabadell, reforming a total of 696 crossroads distributed according to district in: District 1: 203 crossings District 2: 144 crossings District 3: 252 crossings District 4: 97 crosses Hired services: Construction project in BIM

70B6_1

Cour industrial sector UP.7 in Canet de Mar (Barcelona)

SPAIN Urbanization of the UP.7 industrial sector and canalization of the Gavarra stream in Canet de Mar (Barcelona) Sector area: 174,958 m2 Net area: 81,977 m2 Assignment area: 92,981 m2 Green areas: 20,968 m2 Basic road: 20,473 m2 Facilities: 47,200 m2 River system: 4,340 m2 Hired services: Project audit in BIM Construction management in BIM […]