Proyectos

24A15_1

Lithium battery gigafactory for AESC in Navalmoral de la Mata (Cáceres)

Lithium battery gigafactory for AESC in Navalmoral de la Mata (Cáceres). The plant will produce lithium-ion batteries and is considered strategic for the energy transition and sustainable mobility in Europe. It will be developed in 2 phases: Phase 1: Initial implementation of production lines and associated services.Phase 2: Capacity expansion and full development of the […]

Ibereóleo Oil Extraction Plant of the Iberecological Group in Paredes de Nava (Palencia)

Extraction and bottling plant for sunflower oil, rapeseed and olive oil, for Ibereóleo Paredes of the Iberecológica Group in Paredes de Nava (Palencia). The plant has a refining capacity of 53,000 t/year of sunflower oil, 17,000 t/year of rapeseed oil and about 30,000 t/year of olive oil. Plot area 73,677 m2 Builded area 20,609 m2 […]

24B13_4

Network of 18 workshops – warehouses for the Barreiro Group in Spain and Portugal

Network of 18 workshops-warehouses for the Barreiro Group in Spain (A Coruña, Santiago Ourense, Vilagarcía de Arousa, Madrid-Villaverde, Madrid-San Fernando, Mérida, Salamanca, Carballo, Porriño, Narón, Lugo, Valencia, Barcelona) and Potugal (Albergaría a Velha, Braga, Leiria, Matosinhos) Total builded area 10,800 m2 approx. EUROPE Hired services: Basic project Activity project

24A14_1

CATL-Stellantis battery gigafactory in Figueruelas (Zaragoza)

ESPAÑA CATL and Stellantis battery gigafactory located in Figueruelas (Zaragoza) and will be the largest plant of its kind in Spain. With an estimated investment of 4,100 million euros, the complex will have 25 buildings and an annual production capacity of 50 GWh. It will manufacture lithium iron phosphate (LFP) batteries, recognized for their durability […]

40B83_3

Expansion of the Lupa Supermarkets logistics center in Santander

Expansion of the logistics center for frozen, refrigerated and dried products at Supermercados Lupa in Marina de Cudeyo (Santander). Builded surface 2,017 m2 9 loading docks SPAIN Hired services: Basic Project in BIM Executive Project in BIM Construction management/execution in BIM Commissioning in BIM

40B89_4

Semark logistics platform in Palencia (Castilla y León)

Semark logistics platform in Palencia. The platform includes a warehouse and dry yards, fresh chambers and yards, reverse logistics and an expansion of chambers. Plot area: 92,955 m2 Builded surface: 65,889 m2 75 loading docks 584 parking spaces SPAIN Hired services: Basic Project in BIM Executive Project in BIM Management of the tender for the […]

80C08_1

Ice factory in the Balearic dock of the Port of Barcelona

Previous Next Factory of ice sheets produced through water subjected to osmosis in the Balearic dock of the Port of Barcelona. Production capacity 56 ton/day SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management/execution in BIM Start-up

40B26_2

Damm/Alfil logistic center in Palma de Mallorca (Balearic Islands)

Previous Next Expansion of the Damm/Alfil Logistics logistics center in Palma de Mallorca. Builded surface 14,263 m2 6 laoding docks SPAIN Hired services: Basic project in BIM Executive project in BIM PCI Benefit project Management of the works tender Construction management/execution in BIM Construction Management Start-up

40B11_4

Cilsa logistics center for Damm/Alfil Logistics at ZAL Port de Barcelona

Previous Next Cilsa logistics center for Damm/Alfil Logistics at ZAL Port de Barcelona. Superficie construida 35.125 m2 40 muelles de carga SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management/execution in BIM Construction Management Start-up