Proyectos

24C05_1

SMP automotive components production plant in Castellbisbal (Barcelona)

SPAIN Production plant and warehouse for automotive components, adapting a former Carrefour cold store, for the international automotive supplier Samvardhana Motherson Peguform (SMP) of the TATA Group in Castellbisbal (Barcelona) Builded surface 21.410 m2 Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management in BIM Start up

21B3_1

Monteverde storage and distribution center for specialized foods in A Reigosa (Pontevedra)

Previous Next Storage and distribution center for specialized food products for the Horeca and Gourmet Food channel (storage of refrigerated and frozen products) of Monteverde Distribuciones in the municipality of A Reigosa (Pontevedra) Builded surface 3,343 m2 SPAIN Hired services: Executive project Construction/execution management Authorizations from official agencies Start-up

21B4_3

Bon Área automated warehouse and box washing facility in Épila (Zaragoza)

Previous Next Automated warehouse and box washing facility, with a capacity to wash 450,000 boxes/day through 9 parallel washing lines Builded surface 30,120 m2 23 loading docks SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender

21A66_1

Sada poultry slaughterhouse in Castro de Rei (Lugo)

SPAIN Expansion and technological improvements of the poultry slaughterhouse facilities, consisting of new lines, with technological improvements in the equipment for SADA in Castro de Rei (Lugo) Builded surface 7.533 m2 Hired services: Basic poject Executive project Construction Management Start-up

21B2_1

Nogar Group Oil storage terminal in the Port of A Coruña

Previous Next Storage terminal for large liquids for the import of oils, with a capacity of 13,860 m3, for the company Oleosilos del Grupo Nogar. Builded surface 4,560 m2 Warehouse volume 13,860 m3 SPAIN Hired services: Basic project in BIM Executive project in BIM Construction/execution management in BIM

21A60_1

Cargill compound feed manufacturing plant in Begonte (Lugo)

Previous Next Nutrition Techniques wet feed for mink manufacturing plant in the municipality of Cambre (A Coruña) Builded surface 1,280 m2 SPAIN Hired services: Basic project Executive project Construction/execution management Management and processing of grants Start-up

21A36_1

M.BOO meat products processing plant in San Cibrao das Viñas (Ourense)

SPAIN Conditioning of the warehouse for the installation of a beef cutting room for Butchers M.BOO in San Cibrao das Viñas (Ourense) Hired services: Basic Project Executive project Management and processing of grants Construction/execution management Start-up

21A58_1

Sedia multispecies compound feed manufacturing plant in Texeiro (A Coruña)

Previous Next Multispecies feed manufacturing plant for animal nutrition (beekeeping, dogs and cats, equine, poultry, cattle, sheep, pigs and rabbits) of Sedia Agricultural Innovation in the municipality of Texeiro (A Coruña) Builded surface 1,200 m2 SPAIN Hired services: Executive project Construction/execution management Management and processing of grants Start-up

21A57_2

Norgasa multispecies compound feed manufacturing plant in Cambre (A Coruña)

Previous Next Multispecies feed manufacturing plant for animal nutrition (dogs and cats, cattle, poultry, pigs, sheep, poultry, horses and deer) of Norgasa in the municipality of Cambre (A Coruña) Builded surface 3,650 m2 SPAIN Hired services: Basic project Executive project Construction/execution management Start-up

21A56_1

De Heus manufacturing plant for nutritional products for animals in Lugo

Previous Next Manufacturing plant for nutritional products for animals, from complete feed or supplements to concentrates, premixes and tailor-made products for livestock farms of the multinational De Heus Nutrición Animal in Lugo. Builded surface 3,000 m2 SPAIN Hired services: Basic project Executive project Construction/execution management Management and processing of grants Start-up