Proyectos

21A32_1

Rivero meat products processing plant in O Carballiño (Orense)

Previous Next Modernization and expansion of the manufacturing and distribution plant for meat, sausages, derivatives and meat products for Rivero Alimentación in O Carballiño (Orense) SPAIN Hired services: Technological improvements project Process optimization projects Management and processing of grants

22A30_1

Roche Diagnostics manufacturing plant in Suzhoin (China)

New manufacturing plant of Roche Diagnostics Global Operations, located in Suzhou Industrial Park, Jiangsu, China. The complex covers an area of 73,300 m2 and consists of nine main buildings: administrative building, quality control building, production building, warehouse, service center and maintenance building, among others. Builded surface 46,000 m2 SPAIN Hired services: BIM Execution Plan Project […]

21A27_1

Cock farmyard innovation center and slaughter plant in Vila de Cruces (Pontevedra)

Previous Next Innovation center to stimulate and control the production phase of “Gallo de Corral”, for the municipality of Vila de Cruces, made up of an industrial area for slaughtering and cutting up carcasses for marketing, a training center for producers and a laboratory for I+D for the development of new consumer-oriented products. Builded surface […]

21A26_1

Suinca casing manufacturing plant for sausage in Vilamarín (Ourense)

Previous Next Industrial plant for classification and packaging of casing for its use in the food industry, for Suinca deEquipment Industrial in the municipality of Vilamarín (Ourense) Builded surface 1,091 m2 SPAIN Hired services: Basic project Executive project Management and processing of grants Construction/execution management Start-up

21A25_1

Novafrigsa (Coren Group) slaughterhouse and beef processing and distribution plant in Lugo

Previous Next Expansion and modernization of the slaughterhouse for slaughter, and the beef production plant for the production of cold cuts and stews, in addition to the ham dryer with a capacity to produce more than 700,000 pieces per year, of Novafrigsa (Coren Group) in Lugo. Builded surface 30,494 m2 SPAIN Hired services: Executive project […]

20B26_1

Lilly pharmaceutical plant in Alcobendas (Madrid)

Refurbishment of the Lilly pharmaceutical plant in Alcobendas (Madrid). The refurbishment consists of the refurbishment of the rooms for the new L68 semi-automatic lines and L77 automatic drug packaging line and the incorporation of two annexed rooms to provide it with greater spaciousness. Area of the action: 706 m2 SPAIN Hired services: Basic Project in […]

23F14_3

Industrial plant for HUMEX in the Tecnoparc Industrial Estate in Reus (Tarragona)

Industrial plant for HUMEX in the Tecnoparc Industrial Estate in Reus (Tarragona). The floor is made up of a ground floor with a production, storage and changing room area and a first floor where the offices will be located. Plot area: 12,795 m2 Built area: 7,925 m2 SPAIN Servicios contratados: Blueprint Basic and Executive Project […]

23F07_3

Maxam harmonic nitrate storage and loading plant at Mina Algorta Norte (Chile)

Previous Next Maxam harmonic nitrate storage and loading plant at the Mina Algorta Norte facilities in the Antofagasta region (Chile) Builded surface 1,170 m2 Lodine extraction and production mine CHILE Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management in BIM Start-up