Proyectos

21A69_2

Cafés Candelas coffee production plant in the As Gándaras Business Park (Lugo)

Previous Next The new manufacturing plant of the promotion of coffee of new generatrion Will house the entire production process and an administrative building área for Cafés Candelas situada in the Empresarial Park in As Gándaras (Lugo) Builded surface 9,000 m2 SPAIN Hired services: Basic project in BIM Executive project in BIM Construction management in […]

20F04_4

Grupo Corporativo Papelera tissue paper manufacturing plant in Toluca (Mejico)

Previous Next Due Diligence for the Inter-American Investment Corporation (IDB Group) of the new tissue paper production line at the industrial plant of the company Grupo Corporativo Papelera in Toluca (Mexico) Production capacity 30,000 ton/year MÉJICO Hired services: Technical Due Diligence Ambiental Due Diligente Business Due Diligence

21A16_2

Fibran natural collagen casing manufacturing plant for sausages in St Joan Abadesses (Girona)

Previous Next Edible collagen casing manufacturing plant for cured, fresh, cooked and smoked sausages, in different calibers in the markets for both direct and indirect consumption. Builded surface 2,240 m2 SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the work tender Construction/execution management in BIM Start-up

20E05_3

Interasa fabric manufacturing plant for decoration in Sabadell (Barcelona)

Previous Next Reform of the fabric manufacturing plant (curtains, net curtains, upholstery, etc.) for the decoration of the Interasa firm in Sabadell (Barcelona) Builded surface 5,350 m2 SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management in BIM Start-up INTERASA

24A04_1

Digitization of the Seat factory in Martorell (Barcelona)

Previous Next Digitization of the Seat factory in Martorell (Barcelona) Area greater than 300 hectares Annual production of more than 500,000 vehicles SPAIN Hired services: Laser escaner Parametric 3D BIM modeling VR virtual reality environment

23A05_1

Geoalcali (Highfield Resources) salt crushing, flotation and crystallization plant in Navarra/Aragón

Previous Next Geoalcali salt crushing, flotation and crystallization plant (Highfield Resources) in Mina Muga within the municipalities of Undués de Lerda and Urriés (Aragón) and Sangüesa y Javier (Navarra) Process stages: Crushing. Desliming. Flotation. Centrifugation. Thickening. Leaching. Crystallization Production capacity 280,000 tons/year of KCL Builded surface 2,350 m2 Height 35m SPAIN Hired services: Detailed engineering […]

23D03_1

Lacer pharmaceutical laboratory for health care and hygiene in Cerdanyola del Vallés (Barcelona)

Previous Next Automation of palletizing and transportation of the finished product and restructuring of logistics areas for the expansion of new packaging lines in the laboratory. The project involves relevant investments in automation (robots, automatic vehicles), adaptations in civil works, information systems and logistics means. SPAIN Hired services: Measurement of times and methods Basic and […]

21A14_1

AugaVella production plant for spirits and liqueurs in Chantada (Lugo)

Previous Next Plant for distillation and production of spirits and liqueurs for AugaVella in Chantada, in the Ribera Sacra de Lugo. Builded surface 964 m2 SPAIN Hired services: Basic project Executive project Management of the work tender Construction/execution management Start-up