SPAIN Development of the entire Engineering (including Design, Implementation, Integration and Optimisation) and Installation part of the ENDTOEND – JUMPING project. Hired services: Design Implementation Commissioning Optimisation of the access network
Study and extension of coverage in Andalusian Regional Government centres in Andalusia
Previous Next Study and extension of the coverage of the Junta de Andalucía with a visit to a total of 800 centres throughout Andalusia. Visits to health centres, hospitals, schools, large data processing facilities, Plan Infoca forest defence centres, justice offices, education departments, government delegations… improving the coverage service in both 3G and 4G and […]
FTTH network deployment in Cordoba
Previous Next FTTH network deployment project in Cordoba, where a preliminary analysis of the areas was carried out, up to the subsequent design of the FTTH network and its implementation. The main work carried out was: analysis of areas, pre-planning UUII, layout of buildings and vertical lines, obtaining permits, design of the power supply network […]
Acciona Mediterranean Ring Park of the 2018 Mediterranean Games in Tarragona
Previous Next Development of the “Parque del Anillo Mediterráneo de los Juegos del Mediterráneo 2018”, in Tarragona and its area of influence, which represents the creation of a large green space-peri-urban park with a marked sports character SPAIN Hired services: Draft in BIM
Strategic accessibility plan for the ports of Alcudia, Mahón, Ibiza and La Savina (Balearic Islands)
Previous Next Technical assistance for the drafting of the Strategic Plan for the definition of the necessary actions in terms of accessibility in the spaces, buildings and public infrastructures of the ports of Alcudia, Mahón, Ibiza and La Savina of the Balearic Islands SPAIN Hired services: Strategic Mobility Plan
Torresana solid urban waste pneumatic collection network in Terrassa (Barcelona)
Previous Next Pneumatic collection network for urban solid waste collection in the Torresana neighborhood of Terrassa (Barcelona) 4 fractions (rest, organic, paper/cardboard and packaging) 2.8 km long Service to 2,500 people SPAIN Hired services: Basic project in BIM Executive project in BIM
Fernández Wood Pneumatic collection network for solid urban waste in Alto Pozuelo (RM Santiago de Chile)
Previous Next Pre-feasibility study for the pneumatic collection of urban solid waste in the residential real estate development “Alto Portezuelo stage II” of Fernández Wood in the metropolitan region of Santiago de Chile CHILE Hired services: Pre-feasibility study in BIM
Maritime terminal of the Port of Ibiza (Balearic Islands)
Previous Next Urbanization and integral reform of the Maritime Terminal in the commercial docks for the Ibiza-Formentera traffic. The new terminal allows the boarding of passengers and vehicles separately from the different types of vessels through the construction of new pontoons and ro-ro docks. The new layout of the maritime structures allows the mooring of […]
Port of La Savina in Formentera (Balearic Islands)
Previous Next Urbanization and comprehensive reform of the Port of La Savina in Formentera, in order to optimize the flow of passengers and vehicles, as well as improve the roads and pedestrian areas within the service area of the port of La Savina, providing the port with infrastructures adapted to current needs and more comfortable […]
Implementation of CIM (City Modeling Information) technology in Sant Cugat del Vallés (Barcelona)
Previous Next Implementation of a management system for urban services in the city of Sant Cugat del Vallès, based on BIM technology, which establishes order between people, processes and tools within new or existing structures; thus unifying the existing information for each area (road collection and cleaning, lighting, sewage, public thoroughfares, parks and gardens, mobility […]
Destrezas Park in Castellbisbal (Barcelona)
Previous Next Urbanization of the Parque de las Destrezas, ordering a space for children and youth leisure in Castellbisbal. Park area 22,013 m2 SPAIN Hired services Urbanization project in BIM Construction management in BIM Start up
Valoriza Waste collection and street cleaning service center in Sant Cugat del Vallés (Barcelona)
Previous Next Logistics center and operations base for the municipal solid urban waste collection and street cleaning services of Sant Cugat del Vallés, serving a population of 83,337 inhabitants SPAIN Hired services: Basic project in BIM Executive project in BIM Construction management in BIM Start up















