Proyectos

80C26_3

Regional terminal of La Cerdanya Aerodrome in Fontanals (Girona)

Previous Next Technical and economic audit of the structure of the Regional Terminal of the Cerdanya Aerodrome in the municipality of Fontanals (Girona) SPAIN Hired services: Audit of the construction project in BIM AERIA Inversiones Aeronauticas

80A29_1

Two tracks at the Hankook and Hyundai test circuit in Taean, South Korea

Previous Next Two handling course-type lanes at the Hankook Tire&Technology and Hyundai Engineering&Construction test circuit in the municipality of Taean, in the province of South Chungcheong (South Korea) T1-Wet Handling track T2-Dry Handling track SOUTH KOREA Hired services: Basic project in BIM

80C02_1

Mataró Marina (Barcelona)

Previous Next Comprehensive reform of the Mataró Marina promenade applying environmental sustainability criteria. The solution consists of providing a quality environment for the future central gate of the Port of Mataró towards the urban center that will mean the extension of the Ronda Barceló, as well as promoting the presence of the Hotel Atenea and […]

80A28_1

“Shandong Linglong Tire” test circuit in Zhaduyan (China)

Previous Next Test Circuit Wetting Facility for Shandong Linglong Tire Co. Ltd. in Zhaoyuan Township, Shandong Province, China. 4 test tracks: Wet Handling Track (1700 m long and 7 m wide). Wet Skid Pad (5 lanes). Straight Line Braking Track (5 lanes of 300 m). Straight Line Braking Track (200m long) CHINA Hired services: Basic […]

80A27_1

“Double Star PG” test circuit in Shandong (China)

Previous Next “Double Star PG” test circuit for Idiada in Zhaoyuan Township, Shandong Province (China) 11 test tracks: layout, pavements and pavements, drainage and irrigation of tracks, lighting, security cameras, containment systems, access roads, car parks and rest areas 11 buildings: Welcome center. Control tower and emergency services. Administrative building. Petrol, gas and electric vehicle […]

80C24_1

Baggage terminal of the international airport of Bogotá (Colombia)

Previous Next Structural design for the support of the framework of the high-speed automated baggage system of the El Dorado International Airport in Bogotá D.C. (Colombia) Built area 7,125 m2 Building height 22m Number of floors 4 COLOMBIA Hired services: Construction project in BIM

80A26_3

Test circuit “Mahindra Vehicle Development Center” in Kanchipuram (India)

Previous Next “Mahindra Vehicle Development Center” test circuit for Mahindra Ltda. in the municipality of Kanchipuram, in the state of Tamil Nadu (India) 12 test tracks: layout, pavements and pavements, track drainage and irrigation, lighting, security cameras, containment systems, access roads, car parks and rest areas INDIA Hired services: Conceptual design in BIM Basic project […]

80A25_1

Barcelona Zona Franca Tunnel

Previous Next Waterproofing and drainage of groundwater in a tunnel under the coastal road belt B-20 and the RENFE track area SPAIN Hired services: Construction project in BIM

80C19_3

Digitization of the aquifer of the Port of Marbella

Previous Next Digitization of the aquifer of the Port of Marbella in order to have a collaborative cloud tool in which to integrate all the geometric and drilling information SPAIN Hired services: BIM modeling VR for Disclosure Integration of polling databases Digital Twin located in the cloud

80A23_4

Coverage of the Ronda de Dalt (B-20) in Barcelona

Previous Next BIM Quality Check of the construction project for the coverage of the Ronda de Dalt (B-20) in Barcelona. SPAIN Hired servicces: BIM audit of the construction project