ITALY Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Production Plant of Fuel Derived from Waste – CDR in Fusina, in the Veneto region (Italy) Production capacity: 160,000 t/year Hired services: Technical assistance for equipment assembly Technical assistance for start-up
Bulky Waste Treatment Plant in Ravenna (Emilia Romagna)
ITALY Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Treatment Plant for Bulky, Industrial, Containers and RAAES waste in Ravenna, in the Emilia Romagna region (Italy) Treatment capacity: 52,000 t/year Hired services: Technical assistance for equipment assembly Technical assistance for start-up
Reciclatges Pelegrí Industrial and Construction Waste Plant in St Vicenç Castellet (BCN)
Previous Next Reciclatges Pelegrí’s industrial and construction waste transfer, recycling and recovery plant in Sant Vicenç de Castellet (Barcelona) Floor surface 4,900 m2 SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction/execution management in BIM Start up
Daorje Environmental Centre for Non-Hazardous Waste in Cerceda (A Coruña)
Previous Next Expansion of the Leachate Treatment Plant in the Daorje Environmental Center for non-hazardous waste in Cerceda (A Coruña). The reverse osmosis treatment plant has two lines of 120-150 m3/h and the system is mounted in two 40-foot containers SPAIN Hired services: Executive project Construction management Processing of the AAI
Tersa cooling Energy Valorization Plant
Previous Next Cooling of the condensers of the turbines of the furnaces of the energy recovery plant through sea water. SPAIN Hired services: Construction project Construction management
Vallés Occidental Bulky Waste Treatment Plant in Sabadell (Barcelona)
Previous Next Vallés Occidental Bulky Waste Treatment Plant in Sabadell (Barcelona) Treatment capacity 20,000 t/year SPAIN Hired services: Basic project in BIM
FCC Biogas micro-cogeneration plant of the Barbanza Environmental Complex in Lousame (A Coruña)
Micro-Cogeneration Plant for the valorisation of the biogas extracted from the controlled deposit of solid urban waste of the Barbanza Environmental Complex of the “Serra do Barbanza” Community of Municipalities, located in Lousame (A Coruña). 2 microturbines x 65 KW and a heat generator of 210 KW Biogas capture with landfill sealing and electricity generation, […]
Sarpi Special Waste Treatment Centre in Constantí (Tarragona)
Previous Next Design and construction of a new reception pit for special waste with a capacity of 600 tonnes at an apparent waste density of 500 kg/m3 and extension of the storage facility with an area of 350 m2. SPAIN Hired services: Basic project in BIM Executive project in BIM Construction/execution management in BIM Start […]
FCC Controlled deposit of the Barbanza Environmental Complex in Lousame (A Coruña)
Previous Next Enlargement of the controlled solid urban waste deposits of the Barbanza Environmental Complex of the Mancomunidad de Concellos “Serra do Barbanza”, located in Lousame (A Coruña) SPAIN Hired services: Executive project Construction management Processing of the AAI
Veolia hospital waste treatment plant in Lima (Peru)
Previous Next Hospital waste treatment plant in Lima (Peru) Treatment capacity 50,000 t/year Treatment: Autoclave and incineration Source of waste: 376 health centres PERU Hired services: Basic project in BIM
Landfill leachate conduction network of Garraf (Barcelona)
Previous Next Project to replace the current leachate pipeline network generated in the closed unsanbeled area of the landfill and the discharge deposit at the end of the network. Replace the existing collector of the collection network of the unser sealed landfill area with a new HDPE pipe of DN ø 315 mm PN 10 […]
Tersa bulky Waste Treatment Plant in Gavá-Viladecans (Barcelona)
Bulky waste separation plant and treatment of wood that is separated from waste from the Metropolitan Area of Barcelona in Gavá-Viladecans (Barcelona). Fractions: wood, scrap, mattresses, plastic furniture, pressure vessels, etc. Shredding of the wood and storage of the chips according to dimensions in 3 large silos with a capacity of up to 1,000 m3. […]















