Previous Next Wind farm “La Victoria” for NEK Eólica in Chiclana de la Frontera (Cádiz) Power 24MW 12 turbines of 2 MW, 90 m in diameter and a hub height of 80 m Production 57 GWh/year SPAIN Hired services: Feasibility and energy resource evaluation Basic and detailed engineering Processing and permits Construction management and commissioning
Wind Farm for Viesgo Renovables of “El Marquesado” in Puerto Real (Cádiz)
Previous Next “El Marquesado” wind farm for Viesgo Renovables in Puerto Real (Cádiz) Power 24MW 7 turbines of 3,43 MW, 132 m in diameter and 163 m high Production 87 GWh/year SPAIN Hired services: Feasibility and energy resource evaluation Basic and detailed engineering Processing and permits Construction management and commissioning
Elements of compartmentalization of the ITER complex in Cardache
Compartmentalization elements for the resistance to jurisdiction of the International Thermonuclear Experimental Reactor complex in Cardache (France). FRANCE Hired services: Construction project Urbanization project Construction management
Wind Farm for Naturgy of “El Tesorillo” in San Martín del Tesorillo (Cádiz)
Previous Next “El Tesorillo” wind farm for Naturgy Renovables in San Martín del Tesorillo (Cádiz) Power 26MW 12 turbines of 2.2 MW, 110 m in diameter and a hub height of 80 m Production 86 GWh/year SPAIN Hired services: Feasibility and energy resource assessment Basic and detailed engineering Processing and permits Construction management and commissioning
Transformer Station for Endesa in Malaga
Implementación de la plataforma Digital Twin para gestionar la explotación de una estación transformadora para Endesa en Málaga. ESPAÑA Servicios contratados: Láser Scanner Modelización BIM 3D paramétrico del CD Implementación aplicación IDPTwin para la explotación del CD
Greenalia’s forest chip drying and preparation plant in Oroso (A Coruña)
Plant for the drying and preparation of forestry woodchips, using forestry waste, with a process of reception, classification, drying and subsequent storage in bulk and loading onto lorries, also using the woodchips as fuel to generate heat for drying, located in the Sigüeiro business park in the municipality of Oroso (A Coruña). Woodchip production 45 […]
Substation of 220kV of the SEAT megafactory in Martorell (Barcelona)
Previous Next New 220 kV substation with double GIS type busbar and two new 120 MVA positions of the SEAT megafactory in Martorell, including 2 underground HV lines, a new transformer park with 2 new IA 245 kV positions, 2 new 120 MVA power transformers with double secondary 220 kV/20- 20 kV, and 20 kV […]
Biomass transformation plant for the production of GalPellet pellets in Trado (Ourense)
Biomass processing plant for the production of pellets from the remains of forest masses and recycled wood with an integral process (chipping, grinding, drying, pressing…), located in the municipality of Trado (Ourense). Pellet production 10.000 t/año SPAIN Hired services: Basic project Executive project Construction management
Second MT line of the factory in the Zona Franca of Barcelona
Previous Next Second MT line of the factory in the Zona Franca of Barcelona, the engineering scope includes the 20kV connections from the new ST Cerdà substation to the SEAT distribution center, adjustments in the regulation of the centre and approximately 7,400 ml of MV cabling. SPAIN Hired services: Preliminary project in BIM Executive project […]
Recharging points for electric vehicles in the logistics park for Goodman Real Estate for GreenOak in Alcalá de Henares (Madrid)
Previous Next Installation of 34 recharging points for electric vehicles in the outdoor parking spaces of the logistics park made up of 5 warehouses for Goodman Real Estate in Alcalá de Henares (Madrid) 34 pumps on two electric charging posts for 7kW passenger cars SPAIN Hired services: Construction project in BIM Construction management in BIM […]
Electricity distribution networks for the EDP Group in Spain
Projects for extension and reform of electricity distribution networks, carrying out studies for new supplies, processing and management of third party works in the north of Spain. SPAIN Hired services: Executive project Processing of authorizations Distribution processing Management of individual permits Construction Management
Recharging points for electric vehicles in the logistics park for Merlin Properties in San Fernando de Henares (Madrid)
Previous Next Installation of 10 recharging points for electric vehicles in the outdoor parking spaces of the logistics center consisting of a logistics and merchandise distribution warehouse and a cross-docking warehouse by Norton Industrial Buildings for Merlin Logística in San Fernando de Henares (Madrid) 10 pumps on two electrical charging posts for 7kW passenger cars […]