Proyectos

63B33_2

Biomass power plant at Innolact’s cheese production plant in Lea (Lugo)

Forest biomass power plant for steam production to be used in Innolact’s cream cheese production plant in the Castro Riberas industrial estate in Lea (Lugo). Steam production 1.000 kg/h SPAIN Hired services: Basic project in BIM Executive project in BIM Construction Management and start up in BIM

63B32_4

Biomass power plant at the Bon Área Agropark in Épila (Zaragoza)

Biomass power plant for steam production at the Bon Área Agroparque Dried Fruit Plant in Épila (Zaragoza). Steam production10.000 kg/h SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the tender for the works

63A19_1

Reconstruction of the Electrification System in La Palma

Project for the reconstruction of the Medium Voltage ring closure infrastructure between the South and North lines of the island of La Palma, as well as the Medium Voltage network for the evacuation of the new thermal power plant located in the Hermosillas area and the mobile power plant in Las Manchas; both affected by […]

63B29_2

Biomass power plant at Alier paper manufacturing plant for Engie in Roselló (Lleida)

Biomass power plant for the production of thermal energy to be used in the Alier paper manufacturing plant in Roselló (Lleida), at the request of the company Engie. 36 MWt (50 tph) biomass steam boiler of forest biomass and waste paper from the industrial process to be complemented by biogas generated from waste paper production […]

61A13_3

Energy Recovery Plant for Goma-Camps paper industry in La Riba (Tarragona)

Previous Next Power production plant through the incineration of paper waste, for the company Goma-Camps, located in La Riba (Tarragona) Nominal production capacity 50 GWh/year, to supply the steam needs of the tissue paper production process SPAIN Hired services: Basic project in BIM Executive project in BIM

63B31_1

Biomass power plant at Kronospan’s wood-based panel manufacturing plant in Tortosa (Tarragona)

Industrial plant for the manufacture of wooden boards for Kronospan in Tortosa (Tarragona), with a boiler using forest biomass and sawdust as a by-product of the plant’s production process, which produces combustion gases at 700ºC that heat the 100,000 litres of thermal oil at (300ºC), which drive, among other things, the pressing process and provide […]

63A17_1

20kV medium voltage line for Endesa in Teruel

Reform and modification of a 20 kV medium voltage line for Endesa in the province of Teruel. Removal of 30 pylons (5 metal towers and 25 HAV) and 3148.68 metres of medium voltage overhead line. New installation of 28 new lattice supports and 3137.36 metres of medium-voltage overhead line SPAIN Hired services: Layout design and […]