Previous Next Technical assistance framework contract for the expansion and reform of the MV and LV distribution network facilities for Enel Distribución in different autonomous communities in Spain: Aragon Andalusia (Malaga, Cordoba) Extremadura (Badajoz) Canary Islands SPAIN Hired services: Document management and permits Layout, monitoring and reception of projects or works executed by third parties […]
Recharging points for electric vehicles at Freshly Cosmetics logistics center in Gandesa (Tarragona)
Previous Next Installation of 2 charging points for electric vehicles in the outdoor parking spaces of the logistics center for the natural cosmetics industry Freshly Cometics in Gandesa (Tarragona) 2 pumps on two poles with a high capacity of electric charge for 36kW passenger cars SPAIN Hired services: Construction project in BIM Construction management in […]
Energy Recovery Plant of the Guipuzkoa Environmental Complex in Zubieta (GHK phase 1)
Gipuzkoa Environmental Complex in Zubieta (GHK 1) consisting of a mechanical-biological treatment plant for the REMAIN fraction and an energy recovery plant. Capac. TMB OTHER 162,185 t/year Capac. Energy Recovery 194,192 t/year 2 lines with a mechanical capacity per line of 12.50 t/h (PCI 2,850 kcal/kg) and a thermal capacity of max. continuous per 41,43 […]
Los Llanos 66/20 kV wind farm substation (Málaga)
Previous Next Modification of Los Llanos substation by installing a new 40 MVA transformer and transformer position using HIS technology. Includes modification of the medium voltage cell building and restoration of access roads. Built area 5,800 m2 Transmission capacity expansion 40 MVA Rated voltage: 66kV SPAIN Hired services: Viability study Substantial modification Executive processing project […]
Recharging points for electric vehicles in the logistics center of Segro in Rubí (Barcelona)
Previous Next Installation of 8 recharging points for electric vehicles in the outdoor parking spaces of the logistics center of Segro Logistics in Rubí (Barcelona) 8 pumps on two electrical charging posts for 7kW passenger cars SPAIN Hired services: Construction project in BIM Construction management in BIM Start up
Ibiza and Formentera Ecopark Biomethanisation Plant for Giref in Ibiza (Balearic Islands)
Biomethanisation plant of the Ibiza and Formentera Ecopark, consisting of a biomethanisation line by anaerobic digestion of sewage treatment plant sludge and organic fraction of MSW. The facility has 13 composting tunnels for MOR, structured WWTP sludge digestate with vegetable fraction and structured FORM digestate with vegetable fraction. Capacity treatment for organic fraction from selective […]
Torreluenga Substation 30/220 kV (Sevilla)
Previous Next Substation for the opening input – output double circuit line of 220 kV and connection of 4 photovoltaic plants of 170 MW of joint nominal power, through four independent transformers 30/220 kV of 55 MVA each. Built area 10,300 m2 Transport capacity 220MVA Rated voltage: 220kV SPAIN Hired services: Draft processing Executive processing […]
Auxiliary gas engine on a ship at Terminal Nou Port in the Port of Barcelona
SPAIN Installation of an auxiliary gas engine on a ship within the framework of the Cleanport Project, with a global investment of 6.3 million euros Hired services: Technical assistance for Gasification of mobility in the Port of Barcelona
Can Barba Biomethanization and Composting Plant in Terrassa (Barcelona)
Biomethanisation and composting plant for the organic fraction of municipal waste generated in the Vallés Occidental region located in Terrassa (Barcelona). The composting plant has storage in fermentation tunnels for a week and in maturation piles for 4 or 5 days. Capacity FORM treatment 21,000 t/year Compost production 3,000 t/year Quantity of biogas generated 3,500,000 […]
Almudévar Reservoir Dam Substation 132/6.6 kV (Huesca)
Previous Next Substation for the connection of the reversible hydraulic power plant of the Almudévar Reservoir Dam for the production and storage of energy in the municipality of Almudévar (Huesca), by means of two 25 MVA 132/6.6 kV transformers. Built area 11,574 m2 Transport capacity 50MVA Rated voltage: 132kV SPAIN Hired services: Draft processing Executive […]
Recharging points for electric vehicles at Goodman logistics center in Barberà del Vallès (Barcelona)
Previous Next Installation of 20 electric vehicle charging points in the outdoor parking spaces of the Goodman Real Estate logistics center in Barberà del Vallès (Barcelona) 20 dispensers on two poles with a high electrical charge capacity for 7kW passenger cars SPAIN Hired services: Construction project in BIM Construction management in BIM Start up
Tenerife Environmental Complex in Arico (Canary Islands) – Gasification Plant
Tenerife Environmental Complex and the four waste management logistics centres on the island of Tenerife (Canary Islands) for the mechanical-biological treatment of the REMAIN fraction and composting of the organic fraction of municipal solid waste. Capacity of mechanical-biological treatment of REST 486,432 t/year Capacity FORM composting plant 110.000 t/year Gasification Plant (total treatment capacity of […]