Previous Next Installation of 43 electric vehicle charging points in the outdoor parking spaces in the extension of the Gran Jonquera shopping center in La Jonquera. It has a commercial area of 25,297 m2 and restaurant, leisure and office areas. 43 pumps on two electric charging posts for 7.5kW passenger cars SPAIN Hired services: Construction […]
Biogas production plant of Campomayor Waste Recovery Center in Palas de Rei (Lugo)
Biogas production plant at the Campomayor Waste Valorisation Centre in Palas de Rei (Lugo), with different process lines for obtaining biogas from poultry manure from laying hens. Capacity waste treatment (poultry manure) 18.000 t/year Quantity of biogas produced 900.000 Nm3/year, by upgrading process SPAIN Hired services: Technical-economic feasibility study Project
Design engineering of a 90 MVA 30/220 kV Los Galeazos substation in Sevilla
Previous Next Preparation of technical administrative documentation for the construction of a 90 MVA 30/220 kV Los Galeazos substation. The project included: Environmental impact study Engineering of protection, control, communications, civil, structural, hydrology, drainage, topography and geotechnical engineering Burying of 220 kV line to REE substation SPAIN Hired services: Administrative projects for AAC processing Study […]
Green fuel biostation generated at the Riu Sec WWTP in Sabadell (Barcelona)
Previous Next First project in Europe for a multiservice Biostation that will dispense high-capacity electrical energy generated in the solar photovoltaic and wind farms existing at the WWTP, compressed natural gas from the biogas generated in the digestion of sludge from the WWTP, and green hydrogen produced by electrolysis of regenerated water using photovoltaic solar […]
Gas engine generator for electrical supply to a RoRo ship in the Port of Barcelona
SPAIN Construction of an 808 kWe gas-fired engine generator to supply electricity to a RoRo ship (EPT1), within the framework of the Core LNGas Hive Project, with a global investment of 33 million euros. Hired services: Technical assistance for Gasification of mobility in the Port of Barcelona
Biogas production plant of Agroamb Waste Recovery Center in Lugo
Biogas production plant at the Agroamb Waste Valorisation Centre in Castro do Rei (Lugo), with different process lines for obtaining biogas. Capacity waste treatment (sludge and cattle slurry) 33.000 t/year Quantity of biogas produced 1.155.000 Nm3/year by upgrading process SPAIN Hired services: Technical-economic feasibility study Project
Energy audit of the Port of Algeciras (Cádiz)
Previous Next Energy audit of the administrative buildings, industrial premises, maritime stations, car parks and public roads, together with electrical lines for beacons, exterior lighting and power for cranes and machinery, of the facilities of the Port of Algeciras Audited area: 10,300 m2 Energy consumption: 10,730 MWh/year Electrical contracts: 15 electrical contracts SPAIN Hired services: […]
Recharging points for electric vehicles in Tarraco Centrum Shopping Center in Tarragona
Previous Next Installation of 31 electric vehicle charging points in the outdoor parking spaces of the ‘Tarraco Centrum’ shopping center and hotel located next to the Anella Mediterrània in Tarragona. 31 pumps on two electric charging posts for 3.5kW passenger cars SPAIN Hired services: Construction project in BIM Construction management in BIM Start up
Biogas micro-cogeneration plant of the Barbanza Environmental Complex in Lousame (A Coruña)
Micro-Cogeneration Plant for the valorisation of the biogas extracted from the controlled deposit of solid urban waste of the Barbanza Environmental Complex of the “Serra do Barbanza” Community of Municipalities, located in Lousame (A Coruña). 2 microturbines x 65 KW and a heat generator of 210 KW Biogas capture with landfill sealing and electricity generation, […]
Technical assistance for electrical infrastructure and UFD mapping in Madrid and Castilla La Mancha
Previous Next Framework contract for technical assistance to carry out engineering at the installations of the distribution network of Unión Fenosa Distribución: SSEE with voltages from 15 kV to 220 Kv Assembly of equipment with AIS, HIS and GIS technology, of single-phase and three-phase transformers Protection engineering, control, communications, civil, structural, hydrology, drainage, topography and […]
LNG Bunkering in the Port of Barcelona
Previous Next Technical assistance for the granting of licenses and authorizations for LNG bunkering operations in the port of Barcelona. Processing of administrative files, review of administrative and security documentation, control of operations, drafting of mandatory reports. SPAIN Hired services: Technical assistance for Gasification of mobility in the Port of Barcelona
Waste recovery plants for the Consellería do medio rural in Galicia
Integrated system for the management of manure from Galician livestock farms consisting of 4 waste recovery plants in the regions of A Limia, Ordes, Sarria and Deza. Waste treatment capacity (cattle manure, pig manure and poultry manure) 500,000 t/year by plant Quantity of biogas produced 11,000,000 Nm3/year by upgrading process SPAIN Hired services: Technical economic […]















