Iberpotash (ICL) salt and potash port terminal in the Port of Tarragona

Previous Next Iberpotash (ICL) salt and potash port terminal in the Port of Tarragona 2 warehouses with a storage capacity of 145,000 tons, and a free interior section of up to 42 meters 2-track railway unloading terminal with potash and/or salt reception capacity simultaneously. Tracks for train compositions of up to 20 cars (metric/UIC gauge). […]

30D02_2

Tramer (ICL) Vaccum salt hangar in the Port of Barcelona

Previous Next Vaccum salt hangar of Tramer (ICL) in the Port of Barcelona Storage capacity up to 100,000 tons Material extraction up to 1,500 ton/h Free internal section of up to 50 meters and open space thanks to the combination of external metal structure and self-supporting covers SPAIN Hired services: Basic and executive project in […]

23F09_4

Cepsa Gibraltar-San Roque refinery in Cádiz

Previous Next Civil engineering project as part of the “Bottom of Barrel” project, which aims to improve the Cepsa Gibraltar-San Roque refinery by increasing waste conversion using fluidized bed hydrocracking technology Builded surface 383,431 m2 Civil engineering field: Topography. Geology and geotechnics. Explanation and earthworks. Layout, pavements. Shallow and deep foundations and retaining walls. SPAIN […]

30B02_4

Cemex cement factory in Maceo (Colombia)

Previous Next New 170 tn/h cement grinding line at the Cemex factory in Maceo (Colombia) Limestone transport Transport bridge from warehouse to dosing building Dosing building Dosing bridge to mil Cement mil Cement transport Cement silos Transport of cement to bagging Boilermaking COLOMBIA Hired services: Basic project in BIM Detailed engineering project in BIM

23A02_3

Expansion of the Iberpotash (ICL) potash drying, compacting and glazing plant in Súria (BCN)

Previous Next Expansion of the plant for drying and compacting floated and crystallized KCl to convert it into fertilizer for Iberpotash (Israel Chemical Limited) at Mina Cabanasses in Súria (Barcelona) Process stages: Drying. Compacted. Crushing and primary screening. Crushing and secondary screening. Curing and final screening Production capacity 500,000 tons/year of KCL Builded surface 4,956 […]

23F07_1

Maxam harmonic nitrate storage and loading plant at Mina Algorta Norte (Chile)

Previous Next Maxam harmonic nitrate storage and loading plant at the Mina Algorta Norte facilities in the Antofagasta region (Chile) Builded surface 1,170 m2 Lodine extraction and production mine CHILE Hired services: Basic project in BIM Detailed engineering project in BIM Management of the works tender Construction management in BIM Start up

40C1_3

Tramer (ICL) salt and potash port terminal in the Port of Barcelona

Previous Next Tramer (ICL) salt and potash port terminal in the Port of Barcelona Terminal surface: 81,400 m2 2 warehouses with a total surface area of ​​36,950 m2 and an interior free section of 60 and 50 m span, with a capacity for 220,000 tons of product. corporate office building 2.7 kilometers of conveyor belts […]

30D01_4

Codelco georeferenced digitization of underground mine (equipment and facilities) in Chile

Previous Next Georeferenced digitization of underground mine (equipment and facilities) for the National Copper Corporation of Chile (Codelco) Length 12,7 km of tunnels Teams: Conveyor belts Elevators Ventilation Installations Security Facilities structures CHILE Hired services: Tunnel, equipment and installations laser scanner Parametric 3D BIM modeling for asset management

23F02_2

Total petrochemicals polystyrene manufacturing plant in Prat de Llobregat (Barcelona)

Previous Next Deconstrucción, demolición y gestión de los residuos existentes (edificaciones, maquinaria y proceso) de la planta de fabricación de poliestireno de Total Petrochemicals Ibérica en la ZAL Port del Prat de Llobregat (Barcelona) Builded surface 98,980 m2 Deconstruction units: Production warehouses, Tank and Process Area, Silos, Water Plant, Warehouses, Corporate Offices, General Services, Outdoor […]

30B01_1

National Cement Union cement factory in Riobamba (Ecuador)

Previous Next New Clinker line for the cement factory of the Unión Cementera Nacional in Riobamba (Ecuador) Zone 100: Crushing of raw materials (MP) Zone 200: Reception, storage and feeding MP Zone 300: Crude grinding Zone 400: Homogenization silo and oven feed Zone 500: Pyroprocess Zone 600: Clinker transport and storage Zone 700: Auxiliary Systems […]

23A01_2

Iberpotash (ICL) potash drying, compacting and glazing plant in Súria (Barcelona)

Previous Next Plant for drying and compacting floated and crystallized KCl to convert it into fertilizer for Iberpotash (Israel Chemical Limited) at Mina Cabanasses in Súria (Barcelona) Process stages: Drying. Compacted. Crushing and primary screening. Crushing and secondary screening. Curing and final screening Production capacity 500,000 tons/year of KCL Builded surface 5,083 m2 distributed over […]