Proyectos

80A13_2

Improvement of the BV-1414 road between Sabadell and Bellaterra (Barcelona)

Previous Next Improvement of the BV-1414 road (Sabadell – Bellaterra) in the section that goes from the exit of the Gran Vía de Sabadell to the connection with the C-58 motorway (Barcelona – Terrassa) Length 898,45m Lanes: 3 of 3.50 m wide SPAIN Hired services: Construction project in BIM Construction management in BIM

70E12_4

Maritime terminal of the Port of Ibiza (Balearic Islands)

Previous Next Basic and construction project of the maritime terminal in the commercial docks for the Ibiza-Formentera traffic. The new terminal allows the boarding of passengers and vehicles separately from the different types of vessels through the construction of new pontoons and ro-ro docks. The new layout of the maritime structures allows the mooring of […]

70A6_2

Railway terminal of the Logistics Platform of Teruel – Platea

Previous Next Railway terminal of the Teruel Logistics Platform – Platea Plateau area 2,545,510 m2 Track yard 750 meters long for train loading and unloading operations. The new concrete platform accommodates two 35 and 20 meter wide container maneuvering areas, one on each side of the tracks SPAIN Hired services: Basic project in BIM Executive […]

80C08_1

Ice factory at the Balares dock in the Port of Barcelona

Previous Next Factory of ice sheets produced through water subjected to osmosis in the Balearic dock of the Port of Barcelona Production capacity: 56 tons/day SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management/execution in BIM Start up

40C6_4

Iberpotash (ICL) salt and potash railway terminal in Súria (Barcelona)

Previous Next Iberpotash (ICL) salt and potash terminal in Mina Cabanasses (Súria) An interior railway terminal, with 2 tracks of 450 meters in metric gauge, which will allow loading 2 trains simultaneously with 24 hopper cars Road terminal for truck loading dimensioned for 10 trailers/hour of 25T capacity Product hangars and handling system between the […]

80C28_7

Bergé TPN Terminal relocation at the Port of Barcelona

Relocation of Bergé TPN Terminal to the Prince of Spain quay, south end, in the Port of Barcelona. Terminal surface: 72.120 m2 2 operational areas with a total surface area of 46.447 m2 The terminal has a service area that includes the administration building, maintenance workshop and spare parts store, fuel depot, equipment washing area […]