Previous Next Hospital waste treatment plant in Lima (Peru) Treatment capacity 50,000 t/year Treatment: Autoclave and incineration Source of waste: 376 health centres PERU Hired services: Basic project in BIM
Landfill leachate conduction network of Garraf (Barcelona)
Previous Next Project to replace the current leachate pipeline network generated in the closed unsanbeled area of the landfill and the discharge deposit at the end of the network. Replace the existing collector of the collection network of the unser sealed landfill area with a new HDPE pipe of DN ø 315 mm PN 10 […]
Tersa bulky Waste Treatment Plant in Gavá-Viladecans (Barcelona)
Bulky waste separation plant and treatment of wood that is separated from waste from the Metropolitan Area of Barcelona in Gavá-Viladecans (Barcelona). Fractions: wood, scrap, mattresses, plastic furniture, pressure vessels, etc. Shredding of the wood and storage of the chips according to dimensions in 3 large silos with a capacity of up to 1,000 m3. […]
“Pampacruz” landfill closure project (Peru)
Previous Next Recovery of the Area Degraded by Solid Waste in the “Pampacruz” landfill, District of Tambillo, Province of Huamanga, Department of Ayacucho. Surface area: 73,986 m2 Solution adopted: Sanitation and cleaning of the degraded area. Waste profiling and earthmoving. Sealing of the landfill. Biogas capture by passive system and manual burning. Perimeter leachate collection […]
Tersa packaging Separation and Sorting Plant in Gavá-Viladecans (Barcelona)
Separation and classification plant for the different types of light packaging from the selective collection of the Metropolitan Area of Barcelona in Gavá-Viladecans (Barcelona). Treatment capacity packaging 25,000 t/year 68% of packaging recovered SPAIN Hired services: Basic project in BIM Executive project in BIM Integrated environmental authorization Construction management and start up in BIM
“Molle Molle” landfill closure project (Peru)
Previous Next Recovery of the Area Degraded by Solid Waste in the “Molle Molle” landfill, Chalhuanca District, Aymaraes Province, Department of Apurimac. Surface area: 9,306 m2 Solution adopted: Sanitation and cleaning of the degraded area. Waste profiling and earthmoving. Sealing of the landfill. Biogas capture by passive system and manual burning. Perimeter leachate collection system. […]
Goma-Camps Energy Valorisation Plant in La Riba (Tarragona)
Previous Next Energy production plant through the incineration of paper waste, for the company Goma-Camps, located in La Riba (Tarragona) Nominal production capacity 50 GWh/year, to supply the steam needs of the tissue paper production process SPAIN Hired services: Basic project in BIM Executive project in BIM
Can Barba Biomethanisation and Composting Plant in Terrassa (Barcelona)
Biomethanisation and composting plant for the organic fraction of municipal waste generated in the Vallés Occidental region located in Terrassa (Barcelona). The composting plant has storage in fermentation tunnels for a week and in maturation piles for 4 or 5 days. Capacity treatment FORM 21,000 t/year Compost production 3,000 t/year Quantity of biogas generated 3,500,000 […]
“Vista Alegre” landfill closure project (Peru)
Previous Next Recovery of the Area Degraded by Solid Waste in the “Vista Alegre” landfill, Bagua District, Bagua Province, Amazonas Department. Surface area: 38,247 m2 Solution adopted: Sanitation and cleaning of the degraded area. Waste profiling and earthmoving. Sealing of the landfill. Biogas capture by passive system and manual burning. Perimeter leachate collection system. Environmental […]
Waste management and water electrochlorination plant for the North Field East (NFE) project in Qatar
Previous Next Waste treatment and water electrochlorination plant for the North Field East (NFE) project of 4 new liquefied natural gas (LNG) mega trains each with a nominal 7.8 MTPA capacity in Doha (Qatar). Builded surface 18.500 m2 QATAR Hired services: Basic engineering of civil works in BIM Detailed engineering of civil works in BIM
REINNOVA ‘13 – International Congress on municipal waste management and treatment
SPAIN The challenges of waste management in the context of a green economy Hired services: Technical assistance
“Cerro Las Tres Tetas” landfill closure project (Peru)
Previous Next Recovery of the Area Degraded by Solid Waste in the landfill “Cerro Las Tres Tetas”, District of Chancay, Province of Huaral, Department of Lima Surface area: 49,905 m2 Solution adopted: Sanitation and cleaning of the degraded area. Waste profiling and earthmoving. Sealing of the landfill by means of earth. Environmental recovery and landscape […]