Previous Next Georgetown Waste Collection System Master Plan and 14 NDC’s in Guyana acting on a population of 457,875 persons, with the following objectives: Define the collection system Locate containers, indicating type and quantity Design collection routes Define collection vehicle specifications Establish management schemes Size the human resources Implement separation at source pilot test GUYANA […]
Valoriza Waste collection and street cleaning service center in Sant Cugat del Vallés (Barcelona)
Previous Next Logistics center and base of operations for the municipal solid urban waste collection and street cleaning services in Sant Cugat del Vallés, serving a population of 83,337 inhabitants SPAIN Hired services: Basic project in BIM Executive project in BIM Construction management in BIM Start up
Vallès Occidental Waste Treatment Centre in Vacarisses (Barcelona)
Vallés Occidental Waste Treatment Centre in Vacarisses (Barcelona) for the mechanical-biological treatment of the residual fraction of municipal solid waste. Capacity treatment REST 245,000 t/year SPAIN Hired services: Technical assistance for project monitoring and management Technical assistance for the monitoring and management of the works. Start up in BIM
Urban Solid Waste Master Plan of the Guairá Department (Paraguay)
Previous Next Integrated Solid Waste Management Master Plans for five indigenous communities in the department of Guairá, in the eastern region of the Republic of Paraguay: Jorge Naville Santa Librada Cerrito Bo Virgen de las Mercedes Santa Catalina PARAGUAY Hired services: Urban solid waste master plan
Hera closure of the “Coll Cardús” controlled depot in Vacarisses (Barcelona)
Previous Next Closure of the controlled deposit of “Coll Cardús” in Vacarisses (Barcelona) Surface area: 30,7 Ha Solution adopted: Topsoil layer of 30 cm. Soil layer of vegetation support of 50 cm. Reinforcement mesh on slopes to ensure stability. Draining layer for drainage of infiltrated rainwater. Waterproofing layer composed of 2 mm HDPE sheet. Draining […]
Pneumatic collection network for solid urban waste in Alto Pozuelo (MR Santiago de Chile)
Previous Next Pre-feasibility study for the pneumatic collection of solid urban waste in the housing development “Alto Portezuelo stage II” of Fernández Wood in the metropolitan region of Santiago de Chile CHILE Hired services: Pre-feasibility study in BIM
Distiller plant liquid fluid treatment in Ólvega (Soria)
Previous Next Liquid fluid treatment plant at the Distiller plant in Ólvega (Soria) consisting of an E-OX Evapooxidation system for the treatment of liquid organic industrial waste and the installation of a third 2,339 kW cooling tower (wet temperature 24ºC; water inlet/outlet 30-35ºC) Solvent recovery of 30,000 t/year Water and physicochemical treatment of 30,000 t/year […]
Belo Horizonte and Metropolitan district Integrated HCW and BCCW Management Master Plan (Brazil)
Previous Next Master Plan for the Integrated Management of Health Services Waste (HSW) and Bulky and Civil Construction Waste (BCCW) of Belo Horizonte and the Metropolitan District of the State of Minas Gerais. Population: 5,767,414 inhabitants Area: 14,967 km2 Number of municipalities: 50 Population density: 385,3 inhabitants/km2 BRAZIL Hired services: Health care waste master plan […]
Pneumatic collection network for urban solid waste in Torresana in Terrassa (Barcelona)
Previous Next Pneumatic collection network for solid urban waste collection in Torresana neighborhood in Terrassa (Barcelona) 4 fractions (rest, organic, paper/cardboard and packaging) 2.8 km in length Service to 2,500 people SPAIN Hired services: Basic project in BIM Executive project in BIM
Environmental Center of the Pamplona Region in Noain-Valle de Elorz (Navarra)
Pamplona District Environmental Centre located in Noáin-Valle de Elorz, comprising a mechanical treatment plant for the REMAIN and Packaging fractions, a biological treatment plant for organic matter and a plant for the treatment of wood, as well as other facilities for the use of biogas in the form of biomethane and for the supply of […]
Urban Solid Waste Master Plan of the Santa Catarina state (Brazil)
Previous Next Master plan that assesses the initial situation, analyses the different alternatives and specifies the strategic lines of action to improve the management and treatment of waste in the Santa Catarina state. Population: 6,248,436 inhabitants Area: 95,436 km2 Number of municipalities: 293 Population density: 65,3 inhabitants/km2 BRAZIL Hired services: Urban solid waste master plan
Construction of vessel B of the class II controlled waste deposit at Orís (Barcelona)
Previous Next Third phase of expansion of the controlled deposit of class II (non-special) waste in Orís (Barcelona) Floor area extension: 55,059 m2 Capacity expansion: 981,597 m3 Storm drainage of surface and subsoil water Drainage of leachate to the treatment plant. Biogas extraction chimneys: 15 pcs. Control piezometers: 4 pcs SPAIN Hired services: Construction project […]















