Proyectos

40B74_2

Logistics platform for Sertrans in Vilanova del Vallés (Barcelona)

Logistics platform for Sertrans in Vilanova del Vallés (Barcelona). The logistics platform consists of a storage area and office area on the ground floor and first floor. Plot surface area 38.730 m2 Builded surface 22.492 m2 91 loading dock 198 parking places SPAIN Hired services: Basic project in BIM Executive project in BIM Construction/execution management […]

40A16_1

Logis Intermodal logistics sector of Cimalsa in Montblanc (Tarragona)

Previous Next Development of the Logis Intermodal Montblanc logistics sector of CIMALSA in Montblanc (Tarragona). Sector area: 811.969 m2 Net surface area: 403.899 m2 Transfer area: 408.070 m2 Roads: 88.712 m2 Green areas: 148.002 m2 Facilities: 40.679 m2 Technical services: 13.812 m2 Railway system: 56,394 m2 SPAIN Hired services: Urbanization project in BIM

40C11_4

Train wagon for the transport of bulk

Previous Next European research and development project “Hermes”, framed in the Mobility for Growth “Smart Rail” (MG2.2) call for the design and manufacture of a new bulk transport train car. EUROPEAN UNION Hired services: Conceptual project in BIM Detailed engineering project in BIM Manufacturing supervision Commissioning

40B7_3

Segro logistics center in Martorelles (Barcelona)

Previous Next Logistics center of Segro Logistics Martorelles (Barcelona) Builded surface 34,331 m2 40 loading dock SPAIN Hired services: Basic project in BIM Executive project in BIM Construction/execution management in BIM Start up

40B6_2

Segro logistics center in Rubí (Barcelona)

Previous Next Segro Logistics logistics center in Rubí (Barcelona) Builded surface 29,470 m2 9 loading dock for trucks 9 loading dock for vans SPAIN Hired services: Executive project in BIM Construction/execution management in BIM Start up

40B60_5

Goodman logistics center in Constantí (Tarragona)

Previous Next Goodman Real Estate logistics center in Constantí (Tarragona) Builded surface 17.647 m2 40 loading dock SPAIN Hired services: Basic project PCI prestacional project Project Management/Monitoring

40A9_2

Montepino logistics park in Marchamalo (Guadalajara)

Previous Next Logistics park made up of 3 Montepino warehouses in the Transport City of Marchamalo (Guadalajara) Builded surface 68,700 m2 Number of ships: 3 112 loading docks SPAIN Hired services: Executive project in BIM

70A6_2

Railway terminal of the Teruel Logistics Platform – Platea

Previous Next Railway siding of the Teruel – Platea Logistics Platform. Platea surface 2,545,510 m2 750-meter-long track beach for train loading and unloading operations. The new concrete platform accommodates two handling areas for containers 35 and 20 meters wide, one on each side of the tracks SPAIN Hired ervices: Basic project in BIM Executive project […]

40B4_1.1

Goodman CrossDock logistics center for DSV in Molins de Rey (Barcelona)

Previous Next Goodman Real Estate CrossDock logistics center for DSV in Molins de Rey (Barcelona) Builded surface 14,000 m2 110 loading dock SPAIN Hired services: Executive project in BIM Management of the works tender Construction/execution management in BIM Start up

40A8_4

Merlin Properties logistics park in Cabanillas del Campo (Guadalajara)

Previous Next Logistics center for Merlin Properties formed by 4 warehouses in Cabanillas del Campo (Guadalajara) Builded surface 92,994 Number of ships: 4 166 loading docks SPAIN Hired services: Basic project in BIM Prestational fire protection project Management of the works tender Construction Management Start up