Proyectos

23A04_2

Iberpotash (ICL) sylvinite crushing and flotation plant in Súria (Barcelona)

Previous Next Silvinite crushing and flotation plant of Iberpotash (Israel Chemical Limited) at Mina Cabanasses in Súria (Barcelona) Process stages: Primary crushing. Wet grinding. Flotation (hydrosettlement, flotation, regrinding, concentration). dryer. Production capacity 1,000,000 tons/year of KCL Builded surface 5,457 m2 distributed over 6 levels Height 23m SPAIN Hired services: Detailed engineering project audit in BIM […]

24A10_1

Embamat wood packaging manufacturing plant in Sant Esteve Sesrovires (Barcelona)

Previous Next Embamat manufacturing plant for industrial wooden packaging for components, parts and accessories for the automotive industry in Sant Esteve Sesrovires (Barcelona) Builded surface 5,653 m2 SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management in BIM Start-up

21A17_2

Edicas natural collagen casing manufacturing plant for sausages in Ripoll (Girona)

Previous Next Edible collagen casing manufacturing plant for cured, fresh, cooked and smoked sausages, in different calibers in the markets for both direct and indirect consumption. Builded surface 1,975 m2 SPAIN Hired services: Basic project in BIM Executive roject in BIM Management of the work tender Construction/execution management in BIM Start-up

20G03_2

Breat beekeeping machinery manufacturing plant in Gavà (Barcelona)

Previous Next Breat beekeeping machinery manufacturing plant in Gavà (Barcelona) Builded surface 11,352 m2 Total dimensions of the machine: 16 m long by 8 m wide and 2.2 m high. The central part of the machine, where the honeycombs are made, is 11.7 m long by 2.1 m wide and 2.2 m high SPAIN Hired […]

63B29_2

Biomass power plant at Alier paper manufacturing plant for Engie in Roselló (Lleida)

Implementation of a water-tube type biomass power plant with an installed thermal power of 45.27 MWt of high pressure at the Alier paper mill in Roselló (Lleida) at the request of the company Engie. Biomass boiler 60 t/h SPAIN Hired services: Basic project in BIM Executive project in BIM Construction management in BIM Project management […]

20E03_2

Tintoretto cotton fabric dyeing, sizing and finishing plant in Sabadell (Barcelona)

Previous Next Refurbishment of the dyeing, sizing and finishing plant for cotton fabrics of the firm Finishes Tintoretto in Sabadell (Barcelona) Builded surface 23,350 m2 SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction management in BIM Start-up

24B02_2

Electric battery laboratory (Test Center Energy) at the Seat factory in Martorell (Barcelona)

Previous Next SEAT Electric Battery Laboratory (Test Center Energy – TCE) at the Martorell factory (Barcelona), where various energy systems for electric and hybrid vehicles will be developed and tested Builded surface 1,618 m2 Test capacity 1,3 MW SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction […]

23A03_1

Geoalcali (Highfield Resources) potash drying, compacting and glazing plant in Navarra/Aragon

Previous Next Floated and crystallized KCl drying and compacting plant to convert it into fertilizer for Geoalcali (Highfield Resoruces) at Mina Muga in the municipalities of Undués de Lerda and Urriés (Aragón) and Sangüesa and Javier (Navarra) Process stages: Drying. Compacted. Crushing and primary screening. Crushing and secondary screening. Curing and final screening Production capacity […]

22A22_2

R&D laboratory at BBraun LIFT pharmaceutical plant in Rubí (Barcelona)

Previous Next Pilot R&D laboratory in the LIFT (Lean Infusion Factory Technology) production plant of the German pharmaceutical multinational BBraun for research into new formulas at the Rubí plant (Barcelona). SPAIN Hired services: Basic project in BIM Executive project in BIM Construction management/execution in BIM Start-up