Torre Colonial office building in Plaza Europa in l’Hospitalet de Llobregat promoted by Inmobiliaria Colonial and the Puig family Builded surface 21,000 m2 Area per floor: 726 m2 Number of floors: 23 Building height: 90 meters SPAIN Hired services: Project management in BIM Construction management in BIM
Hotel Senator in Barcelona
The 4-star Hotel Senator, located in the city of Barcelona. It is made up of two buildings that have 213 rooms and suites, 1 restaurant and spa. Builded area 19,601 m2 SPAIN Hired services: BIM Executive Project Audit
Iberpotash (ICL) outdoor field and handling for de-icing salt in Súria (Barcelona)
Previous Next Camp for external storage of de-icing salt and Handling necessary for the transport of material from the new processing plant and the loading terminal, optimizing through suitable storage sections the work to be carried out and the CAPEX vs. volume stored Capacity for 2 pallets of 20,000 tons each 470 m of conveyor […]
Iberpotash (ICL) hangar of CT-Salt in Súria (Barcelona)
Previous Next Value Engineering of the Project of the new Hangar of CT Salt with the final objective of carrying out a Re-Engineering that considers an optimal design alternative and represents savings in CAPEX to make the investment viable. Key points discussed: Redesign bulk-weighers railway cargo, allowing to eliminate an intermediate buffer and associated mechanical […]
Geoalcali (Highfield Resources) fines hangar in Navarra/Aragón
Previous Next Geoalcali (Highfield Resources) fines hangar in Muga Mine within the municipalities of Undués de Lerda and Urriés (Aragón) and Sangüesa y Javier (Navarra) Builded surface of 1,050 m2 Storage capacity up to 1,600 tons Material input of up to 30 tn/h Manual material extraction using shovels Free internal section of up to 32 […]
Geoalcali (Highfield Resources) salt vaccum hangar in Navarra/Aragón
Previous Next Geoalcali (Highfield Resources) salt vacuum hangar in Mina Muga within the municipalities of Undués de Lerda and Urriés (Aragón) and Sangüesa y Javier (Navarra) Builded surface 4,100 m2 Storage capacity up to 22,000 tons Material input of up to 38 tn/h in F1 and 76 tn/h in F2 Material extraction of 300 tn/h […]
Geoalcali (Highfield Resources) potash hangar (GMOP and SMOP) in Navarra/Aragón
Previous Next Potash hangars (GMOP and SMOP) of Geoalcali (Highfield Resources) in Mina Muga within the municipalities of Undués de Lerda and Urriés (Aragón) and Sangüesa y Javier (Navarra). Characteristics of each: Buided surface 3,400 m2 Storage capacity up to 22,000 tons Material input of up to 65 tn/h in F1 and 130 tn/h in […]
Geoalcali (Highfield Resources) ROM (raw ore) hangar in Navarra/Aragón
Previous Next Geoalcali (Highfield Resources) ROM (raw ore) hangar in Mina Muga within the municipalities of Undués de Lerda and Urriés (Aragón) and Sangüesa y Javier (Navarra) Builded surface 4,950 m2 Storage capacity up to 28,800 tons Material input up to 1200 tn/h Material extraction up to 800 tn/h Free internal section of up to […]
Brotec highway B-475 “Ruta Minera” in the II Region of Antofagasta (Chile)
Previous Next Comprehensive improvement of Highway B-475 “Ruta Minera” in the II Region of Antofagasta, in the section between La Negra and Mina Escondida (Chile) Length: 137 km (2 lanes of 3.5 m in each direction with hard shoulders of 3.5 m on both sides) Control station that centralizes all the operator’s operational information Toll […]
Matsa-Trafigura handling (ribbons, trippers and shiploaders) in the Port of Huelva
Previous Next Logistical infrastructure for cargo handling of ships with tape-tripper along the south side of the dock. Belt infrastructure prepared for 2 bridge shiploaders with simultaneous loading to two Panamax vessels (70,000 tons) SPAIN Hired services: Basic project in BIM
Cleveland Potash (ICL) Master Plan industrial and mining facilities in Boulby (UK)
Previous Next Master Plan of the Cleveland Potash (ICL) mining facilities in Boulby (UK) for the processing of Polyhalite (hydrated sulfate of potassium, calcium and magnesium), with the aim of allowing the increase of production to 3MT in the year 2030, analyzing the number and capacity of processing plants, warehouses by type of material, handling […]
Imouraren technic transport infrastructure of uranium processing plant (Niger)
Transport infrastructure (roads, rail and airfield) and structural design of the uranium treatment plant located in Imouraren (Niger) which houses the largest uranium mine in Africa and the second largest in the world. Extension 15 km2 Maximum production 5,000 tons/year Estimated exploitation time more than 35 years NÍGER Hired services: Basic project in BIM Detailed […]




















