Proyectos

40C1_3

Ibepotash (ICL) salt and potash port terminal in the Port of Barcelona

Previous Next Iberpotash (ICL) salt and potash port terminal in the Port of Barcelona Terminal area: 81,400 m2 2 warehouses with a total surface area of ​​36,950 m2 and an interior free section of 60 and 50 m span, with a capacity for 220,000 tons of product. corporate office building 2.7 kilometers of conveyor belts […]

80A04_2

Rutas del Loa concession highway in Atacama (Chile)

Previous Next Concession highway “Rutas del Loa” in the Antofagasta region, covering the communes of Sierra Gorda and Calama (Chile) Length: 111,8 km to double lane of route 25 (between the link of Carmen Alto and the city of Calama) 24,6 km ring road in the city of Calama, which will link different routes 345 […]

80A03_2

C32 Blanes-Lloret motorway Tordera-Lloret de Mar section (Girona)

Previous Next C32 Blanes-Lloret motorway Tordera-Lloret de Mar section (Girona) Length: 6,6km Number of viaducts: 6 with a total length of 935 m (the largest is Sant Daniel with a span of 384 m) Number of tunnels: 2 with a total length of 490,8 m (the largest is El Ángel, 335 m long) Main link: […]

80B18_1

Smart Train Day 2013

SPAIN First edition of Smart Train Day Session 1. SMART ENERGY- Efficiency and sustainability in metropolitan railways. Session 2. SMART PEOPLE – Initiatives and experience of Transport for London in real-time customer information on the web and social networks. Session 3. SMART MOBILITY – FGC Smart Train. An efficient transport for a sustainable country. Hired […]

80B02_2

Track yard and replacement of equipment at the Martorell station FGC link

Previous Next Design of the track yard and replacement of equipment at the Martorell station Link of the Llobregat-Anoia line of the Ferrocarriles de la Generalitat de Catalunya (FGC), defining all the work units necessary to incorporate the elements of civil works ( including the general prism and secondary channels), track superstructure, electrification, communications and […]

80A02_1

Urban highway of Américo Vespucio Oriente in Santiago de Chile

Previous Next Américo Vespucio Oriente underground urban highway in Santiago de Chile (1st linear work project using BIM technology carried out in Chile) Length: 9,1km Sector 1. El Salto – South to the Centennial Bridge with an extension of 3.4 km Sector 2. Centennial Bridge – Prince of Wales with an extension of 5,7 km […]

70E11_4

Port of La Savina in Formentera (Balearic Islands)

Previous Next Comprehensive reform of the Port of La Savina in Formentera, in order to optimize the flows of passengers and vehicles, as well as improve the roads and pedestrian areas within the service area of ​​the port of La Savina, providing the port with adapted infrastructures to the current needs and more comfortable for […]

80B01_4.4

Railway connection of the Rubí Operational Center (Barcelona)

Previous Next Railway connection of FGC’s Rubí Operations Center (COR) with the Papiol/Mollet branch (ADIF) through UIC international gauge tracks. The necessary actions are divided into three areas: Necessary modifications in the current ADIF general routes Necessary modifications in the current FGC general routes Execution of new railway branch SPAIN Hired services: Informative study in […]

80A01_1

South Pan-American Highway Section from Ica to Quilca (Peru)

Previous Next Duplication of the South Pan-American Highway – Ica-Quilca section (Peru), the largest road project carried out in BIM in Latin America Total length: 202,32 Km Duplication: 161,25 Km Overlap: 10,20 Km 4-lane variant: 9,93 km 2-lane variant: 20,94 km Number of structures: 12 with a total length of 1,976 m (2 double girder […]