Proyectos

61A22_1

Treatment Plant for the residual fraction of municipal waste in Imola (Emilia Romagna)

Previous Next Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Treatment Plant for the residual fraction of municipal waste in Imola, in the Emilia Romagna region (Italy) Treatment capacity: 150,000 t/year ITALY Hired services: Technical assistance for equipment assembly Technical assistance for start-up

61A21_3

Composting Plant for the Organic Fraction of municipal waste in Signoressa Trevignano (Veneto)

Previous Next Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Composting Plant for the organic fraction of municipal waste in Signoressa di Trevignano, in the Veneto region (Italy) Treatment capacity: 33,250 t/year ITALY Hired services: Technical assistance for equipment assembly Technical assistance for start-up

61A20_2

Composting Plant for the Organic Fraction of municipal waste in Rimini (Emilia Romagna)

Previous Next Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Composting Plant for the organic fraction of municipal waste in Rimini, in the Emilia Romagna region (Italy) Treatment capacity: 57,000 t /year ITALY Hired services: Technical assistance for equipment assembly Technical assistance for start-up

61A19_1

Refuse Derived Fuel (RDF) Production Plant in Fusina (Veneto)

ITALY Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Production Plant of Fuel Derived from Waste – CDR in Fusina, in the Veneto region (Italy) Production capacity: 160,000 t/year Hired services: Technical assistance for equipment assembly Technical assistance for start-up

61A18_1

Bulky Waste Treatment Plant in Ravenna (Emilia Romagna)

ITALY Technical assistance for the supervision of the assembly of heavy machinery and start-up of a Treatment Plant for Bulky, Industrial, Containers and RAAES waste in Ravenna, in the Emilia Romagna region (Italy) Treatment capacity: 52,000 t/year Hired services: Technical assistance for equipment assembly Technical assistance for start-up

61C19_4

Daorje Environmental Centre for Non-Hazardous Waste in Cerceda (A Coruña)

Previous Next Expansion of the Leachate Treatment Plant in the Daorje Environmental Center for non-hazardous waste in Cerceda (A Coruña). The reverse osmosis treatment plant has two lines of 120-150 m3/h and the system is mounted in two 40-foot containers SPAIN Hired services: Executive project Construction management Processing of the AAI

61A35_1

Tersa cooling Energy Valorization Plant

Previous Next Cooling of the condensers of the turbines of the furnaces of the energy recovery plant through sea water. SPAIN Hired services: Construction project Construction management

61C18_3

FCC Biogas micro-cogeneration plant of the Barbanza Environmental Complex in Lousame (A Coruña)

Micro-Cogeneration Plant for the valorisation of the biogas extracted from the controlled deposit of solid urban waste of the Barbanza Environmental Complex of the “Serra do Barbanza” Community of Municipalities, located in Lousame (A Coruña). 2 microturbines x 65 KW and a heat generator of 210 KW Biogas capture with landfill sealing and electricity generation, […]

61A15_4

Sarpi Special Waste Treatment Centre in Constantí (Tarragona)

Previous Next Design and construction of a new reception pit for special waste with a capacity of 600 tonnes at an apparent waste density of 500 kg/m3 and extension of the storage facility with an area of 350 m2. SPAIN Hired services: Basic project in BIM Executive project in BIM Construction/execution management in BIM Start […]