Proyectos

61A9_1

Ferrovial Zonzamas Environmental Complex in Lanzarote (Canary Islands)

Zonzamas environmental complex in Lanzarote (Canary Islands) for the mechanical-biological treatment of the residual fraction and composting of the organic fraction of municipal solid waste Capacity treatment of REST 35 t/h Capacity treatment of FORM 36.000 t/year SPAIN Hired services: Basic project in BIM

61C11_1

“Pampaya” landfill closure project (Peru)

Previous Next Recovery of the Area Degraded by Solid Waste in the “Pampaya” landfill, City of Tarma, Province of Tarma, Department of Junín. Surface area: 48,885 m2 Solution adopted: Sanitation and cleaning of the degraded area. Waste profiling and earthmoving. Sealing of the landfill. Biogas capture by passive system and manual burning. Perimeter leachate collection […]

61A8_1

Tenerife Environmental Complex in Arico (Canary Islands)

Tenerife Environmental Complex and the four waste management logistics centres on the island of Tenerife (Canary Islands) for the mechanical-biological treatment of the REMAIN fraction and composting of the organic fraction of municipal solid waste. Capacity treatment mechanical-biological of REST 486,432 t/year Composting capacity of FORM 110,000 t/year Gasification Plant (total treatment capacity of the […]

61C10_1

“Quitasol Imponeda” landfill closure project (Peru)

Previous Next Recovery of Areas Degraded by Solid Waste in the “Quitasol Imponeda” landfill, Abancay District, Abancay Province. Department of Apurimac Surface area: 18,418 m2 Solution adopted: Sanitation and cleaning of the degraded area. Waste profiling and earthmoving. Sealing of the landfill. Biogas capture by passive system and manual burning. Perimeter leachate collection system. Environmental […]

61A7_2

Environmental Waste Management and Treatment Complex of Gipuzkoa in Zubieta (GHK phase 2)

Gipuzkoa Environmental Complex in Zubieta (GHK 2) for the composting and biomethanisation of the organic fraction of municipal solid waste, and the treatment and maturation of the slag produced in the phase 1 energy recovery plant. Capacity treatment FORM 40,000 t/year Capacity treatment slag 52,000 t/year Composting capacity 4,750 t/year Quantity of biogas generated 650 […]