Previous Next Esporc compound feed railway terminal in Balenyà (Barcelona) and viability of transport in convoys of hopper wagons to the Port of Tarragona. SPAIN Hired services: Informative study
Goodman Multilevel logistics center for DSV in Molins de Rey (Barcelona)
Previous Next Multilevel logistics center of Goodman Real Estate for DSV in Molins de Rey, consisting of 2 floors that can support a weight of up to 5 tons/m2 and a clear height of 10.50 m Builded surface 35,000 m2 47 loading dock SPAIN Hired services: Executive project in BIM Management of the works tender […]
Merlin Properties logistics park in San Fernando de Henares (Madrid)
Previous Next Logistics center composed of a logistics and merchandise distribution warehouse and a crossdocking warehouse from Norton Industrial Buildings for Merlin Logistics in San Fernando de Henares (Madrid) Builded surface 33,487 m2 Number of ships: 2 130 loading docks SPAIN Hired services: Basic project in BIM Executive project in BIM Prestational fire protection project […]
Iberpotash (ICL) road and rail freight terminal in Súria (Barcelona)
Previous Next Iberpotash (ICL) salt and potash terminal in Cabanasses Mine (Súria) An inland railway terminal, with 2 tracks of 450 meters in metric width, which will allow the simultaneous loading of 2 trains of 24 hopper cars Road terminal for truck loading sized for 10 trailers / hour with 25T capacity Product hangars and […]
Goodman logistics center for Bergé Logistics in Sant Esteve Sesrovires (Barcelona)
Previous Next Goodman Real Estate logistics center for Bergé Logistics in Sant Esteve Sesrovires (Barcelona) Builded surface 20,487 m2 21 loading dock SPAIN Hired services: Basic project in BIM Management of the works tender Construction Management Start up
Logicor logistics park in the “Ciudad Circuito de Cheste” Business Park (Valencia)
Previous Next Logistics park made up of 8 Logicor warehouses in the “Ciudad Circuito de Cheste” Business Park (Valencia) Builded surface 53,932 m2 Number of ships: 8 68 loading docks SPAIN Hired services: Basic project in BIM Prestational fire protection project Management of the works tender Construction Management Start up
Port of Ibiza maritime terminal
Previous Next Basic and constructive project of the maritime Terminal in the commercial docks for the Ibiza-Formentera traffic. SPAIN Hired services: Basic project in BIM Construction project in BIM
Goodman logistics center in Sant Esteve de Sesrovires (Barcelona)
Previous Next Goodman Real Estate logistics center in Sant Esteve Sesrovires (Barcelona) Builded surface 17,562 m2 12 loading docks SPAIN Hired services: Basic project in BIM Management of the works tender Construction Management Start up
Segro logistics park in Sant Esteve Sesrovires (Barcelona)
Previous Next Logistics park made up of 4 Segro Logistics warehouses in Sant Esteve Sesrovires (Barcelona) Builded surface 21,557 m2 Number of ships: 4 27 loading docks SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction/execution management in BIM Construction Management Start up
Matsa-Trafigura copper ore port terminal in the Huelva Port
Previous Next Matsa-Trafigura copper ore port terminal at the Huelva’s Port Three copper ore hangars with a storage capacity of 660,000 tons with a surface area of 63,230 m2 Road terminal for truck unloading with parking area for up to 65 trucks Logistic infrastructure for cargo handling of ships with tape-tripper along the south side […]
Logistic center of the natural cosmetics industry Freshly Cosmetics in Gandesa (Tarragona)
Previous Next Logistics center of the Freshly Cometics natural cosmetics industry in Gandesa (Tarragona) Builded surface 9,879 m2 5 loading dock SPAIN Hired services: Basic project in BIM Executive project in BIM Management of the works tender Construction/execution management in BIM Construction Management Start up
Segro logistics park in Gavilanes II in Getafe (Madrid)
Previous Next Logistics park made up of 2 Segro Logistics warehouses in the Los Gavilanes industrial estate in Getafe (Madrid) Builded surface 37,790 m2 Number of ships: 2 43 loading docks SPAIN Hired services: Basic project in BIM Prestational fire protection project




















