Proyectos

63B11_1

Installations generating thermal energy through forest biomass boilers in Berguedà

Thermal energy generation facilities using forest biomass boilers to provide the energy required by 31 public facilities in six municipalities of Berguedà (Bagà, Berga, Cercs, Gósol, La Pobla de Lillet and Saldes). The expected biomass consumption is 1,200 t/year of forest chips, coming from the management of the forests of the villages that are part […]

63A07_1

Periodic regulatory reviews of the electrical distribution network

Previous Next Annual technical supervision established by legislation to verify the correct state of operation and safety of the medium-voltage lines and transformer stations of the distribution companies. 1,400 km of overhead medium-voltage lines. 3,500 transformation centers. SPAIN Hired services: Documentary management and permits Layout, monitoring and reception of projects or works carried out by […]

80C16_1

Supply of LNG to barges from the Enagás plant in the Port of Barcelona

SPAIN Modification of the 32 H berth for the supply of LNG to Gabarras (EPM1), within the framework of the Core LNGas Hive Project, with a global investment of 33 million euros. Hired services: Technical assistance for Gasification of mobility in the Port of Barcelona

63A13_1

Reconfiguration of underground LV lines and relocation of transformer substation in high density urban area

Previous Next Relocation and refurbishment of a major Transformer Substation and associated Low Voltage Lines in a densely populated urban area with the aim of improving quality, safety and reliability. 4 transformers of 1000 KVA 23 low voltage lines with 240 mm2 conductors SPAIN Hired services: Documentary management and permits Layout, monitoring and reception of […]

63B25_1

Biogas production plant of Grupo Aira Waste Recovery Center in Taboada (Lugo)

Development and study of waste recovery plants, with different process lines to obtain biogas with/without upgrading. Capacity waste treatment (cattle slurry, sludge and slaughterhouse by-products) 70.000 t/year Quantity of biogas produced 30.000 MWh/year SPAIN Hired services: Technical-economic feasibility study Project

63A12_3

Improvement of medium voltage installations at Endesa distribution transformer stations

Previous Next Improvement of medium-voltage installations as part of Endesa Distribución’s transformation center remote control plan, adapting, refurbishing and renovating the medium-voltage installations housed in these centers, thus making it possible to replace the medium-voltage cabins in which the installation of remote control equipment with a communication system is carried out so that they can […]

63B24_1

Biogas production plant of Xallas Cooperative Waste Recovery Center in A Coruña

Biogas production plant of the Waste Valorisation Centre of Cooperativa Xallas in A Coruña, with different process lines for obtaining biogas from cattle slurry from members’ farms. Capacity waste treatment (sludge, cattle slurry, slaughterhouse by-products) 50.000 t/year Quantity of biogas produced 300,000 Nm3/year by upgrading process SPAIN Hired services: Technical-economic feasibility study Project

63A11_4

15 kV MV network and switching centre for the Jerezol photovoltaic plant in Jerez de la Frontera (Cádiz)

Previous Next Redesign of existing 15 kV line by changing the conductor and junction, together with the installation of switching centers, for the evacuation of a 900 kWn photovoltaic plant, including: Change of overhead line conductor Replacement of existing supports Modification and installation of new 15 kV switching centers SPAIN Hired services: Administrative projects for […]