Proyectos

62A3_1

Arsenic Abatement Plant located in the San Antonio area, Santiago (Chile)

Previous Next Arsenic Abatement Plant located in the San Antonio area in the eastern sector of Santiago de Chile. Arsenic abatement system for the production of 500 l/s First stage: in-line coagulation process followed by filtration with Greensand Plus ADGS+ media. Second stage: filtration with ferric oxide adsorption medium Bayoxide E-33 CHILE Hired services: Basic […]

62D2_1

Excon Quebrada Blanca open-pit mine tailings dam in Tarapacá (Chile)

Previous Next Tailings dam for exploitation of Cu and Mo ore from the Quebrada Blanca open pit mine, in the Tarapacá region (Chile) The new dam is 641 m long, 120 m high and has a base of 350 m The crest of the dam is at an absolute height of 3,855 m above sea […]

62C2_1

Suez Biofactory (thermal drying and gasification of sludge) in PTAS La Farfana (Chile)

Previous Next Project for the implementation of low-temperature thermal drying lines for urban sludge and energy recovery through advanced synthesis gasification technologies at the La Farfana WWTP (Chile). Thermal sludge drying (hourly capacity): 24.10 tn/h/line (2 lines) Dry sludge gasification: 6.67 tn/h (total in 3 pyrolysers) Cogeneration by syngas in engines at 100% load and […]

62A2_1

Potable Water Production Works in Rinconada de Maipú, Maipú Commune, RM Santiago (Chile)

Previous Next Reform and improvement of the drinking water service in the rinconada de Maipú, located in the metropolitan region of Santiago de Chile. Semi-buried pond of V=1.500 m3 Steel feeder with a diameter of 400 mm Feeder flow meter Steel impeller with a diameter of 300 mm Discharge flowmeter Chlorination centre for dosing against […]

62C1_3

Suez urban wastewater treatment plant in Ciudad David (Panama)

Previous Next Urban Wastewater Treatment Plant equipped with secondary treatment, anaerobic sludge digestion with biogas conversion and a wastewater collector, located on a 157,200 m2 plot in Ciudad David (Panama) Design flow 51,840 m3/day (250,000 inhabitants) Treatment line composed of: Pretreatment. Sludge treatment. Disinfection. Sludge treatment by anaerobic digestion (using LIPP biodigesters) PANAMA Hired services: […]

62D1_1

OHL Antamina mine tailings dam of the Asana river in Moquegua (Peru)

Previous Next Tailings dam of the Asana River for exploitation of Cu and Zn ore from the Antamina Mine, in the Moquegua region (Peru) The new dam is 213 m long and 48 m high The central section of the dam has a total width of 68.30 m, which decreases as we approach the lateral […]

23F11_4

Biostation for green fuels generated at the Riu Sec WWTP in Sabadell (Barcelona)

Previous Next First project in Europe for a multi-service BioStation that will dispense high load capacity electricity generated from the existing solar photovoltaic and wind farms at the WWTP, compressed natural gas from the biogas generated in the digestion of the WWTP sludge, and green hydrogen produced by electrolysis of reclaimed water using solar photovoltaic […]

62A1_4

Chamisero Potable Water Treatment Plant, Colina district, Santiago (Chile)

Previous Next Chamisero Potable Water Treatment Plant to supply the areas of Chicureo and Chamisero (in the commune of Colina in Santiago de Chile). Flow of 1,000 l/s Preliminary Stage: Catchment works in Batuco canal. Screening (coarse and fine). Pre-chlorination. Raw Water Elevation Plant (PEAC) and Desanding. Primary Stage: Parshall Canal. Rapid mixing chamber and […]

61A52_1

Palencia Waste Treatment Centre (Castilla y León)

Digitalisation of facilities through 3D modelling from 2D as-built architectural and structural drawings of the Palencia Environmental Complex. Built area: 20,973 m2 SPAIN Hired services: BIM project 3D modelling